My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11627
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11627
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:18:13 PM
Creation date
10/12/2006 5:04:58 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8112.600
Description
Arkansas White Red Basins Interagency Committee AWRBIAC
Basin
Arkansas
Water Division
2
Date
1/1/1952
Title
Arkansas White Red Basins Inter Agency Committee Procedure Guide Second Edition
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-t", <br /> <br />l;:?> <br />,.. <br />~ <br />~ <br />~ <br /> <br />(Insert in Procedure Guide and destroy page <br />of same number dated 1 January 1952) <br />Rev. 15 February 1952 <br />AWRBIAC PROCEDURE GUIDE <br /> <br />x. PREPARAT I ON AND FORMAT OF THE FINAL REFORT (CONT' D) <br /> <br />Other Faotors - Additional provisions affecting the prepara- <br />tion and construction of the report will be studied by the Tulsa <br />Group and presented to the Inter-Agenoy Committee for deoision as <br />neoessary from time to time. These may include suoh subjects as <br />necessary conformance to statutory responsibilities of individual <br />agencies, adaptability to fUture instructions from higher authority, <br />channels for submission of.the report, eto, <br /> <br />Priorities. Scl~dules of study established by each agency for ** <br />planning activities in each subbasin area have been adjusted to the <br />priority needs and desires of the states, and adopted at the 11th <br />meeting. The State and Federal agencies on the six work groups <br />listed first on the "Schedule for Preparation of Report" will fellow <br />these priorities and the remaining groups will adhere as far as ap~ <br />plicable. *** <br /> <br />** Beginning of revision <br />*** End of revision <br /> <br />X-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.