My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11627
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11627
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:18:13 PM
Creation date
10/12/2006 5:04:58 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8112.600
Description
Arkansas White Red Basins Interagency Committee AWRBIAC
Basin
Arkansas
Water Division
2
Date
1/1/1952
Title
Arkansas White Red Basins Inter Agency Committee Procedure Guide Second Edition
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'. <br /> <br />'.~:ft <br /> <br />14 <br />-..l <br />\',) <br />... <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />'. <br /> <br />..r <br /> <br />1 January 1952 <br />Rev. 15 April 1952 <br /> <br />AWRBIAC PROCEDURE GUIDE <br /> <br />VII. SCHEDULE FOR pr~PARATION OF REPORT <br />, <br /> <br />'A schedule has' been adopted by the AVffiBIAC for meeting the. aut~or- <br />i~ed.objective on 30 June 1954: <br /> <br />This schedule, shown on the following page, sets forth: (a) funo~ <br />tional subjeots of the report, (b) major sub-divisions of work which <br />lead progressively to the objective, and vmich indicate the progressive <br />development of the bases for the major deoisions, (0) completion dates <br />for major sub-divisions of work and (d) principal sub-divisions of the <br />functional subject items within the soope of the major sub-divisions. <br /> <br />Assignment of responsibility for perfor~ance of the soheduled. <br />work is the subjeot of Section VIII. Editorial details of report <br />formulation and writing are found in Seotion X. <br /> <br />Development of Comprehensive Plan. A series of memoranda ex- .. <br />panding the steps of the above mentioned schedule has been approved <br />for preparation along lines indioated in Appendix F-2, Minutes of <br />Informal Session No.2-52, 26 February. This appendix is indicative <br />of ourrent thinking about this subject, and the direction of probable <br />acoord, but is not presently an inflexible decision of AVffiBIAC. <br /> <br />The proposed series of memoranda would inolude amplifications <br />of the "Schedule" in the following respeotsl <br /> <br />Section I. Procedure in Development of a Comprehensive <br />Plan for the AVm Basins. <br /> <br />a. Steps in Preparing the A~R Report. <br /> <br />b. Flow of report material in AVm Study. <br />(Flow oharts) <br /> <br />Seotion II. Projeot and Program Formulation in AWR Study. <br /> <br />Section I is to deal with Procedu res and Seotion II With Prinoiples. <br />Seotion Ia is to be based in large part on Mr. Short's memorandum and <br />refleots the general "Sohedule" approved by the Committee. Seotion Ib <br />will inolude the flow oharts prepared by the task foroe under Mr. Fairlam~ <br />together with some explanatory material (These oharts show the ohan- <br />nels through which report material, interim reports, and the final... <br /> <br />VII-l <br />
The URL can be used to link to this page
Your browser does not support the video tag.