My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11627
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11627
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:18:13 PM
Creation date
10/12/2006 5:04:58 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8112.600
Description
Arkansas White Red Basins Interagency Committee AWRBIAC
Basin
Arkansas
Water Division
2
Date
1/1/1952
Title
Arkansas White Red Basins Inter Agency Committee Procedure Guide Second Edition
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />(~ <br />*... <br />~ <br />~ <br />.....t <br />I <br />I <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />(Inssrt in Procedur", G,uid", .and destroy page <br />of same number dated l'January' 1952) <br /> <br />Revised 15 May 1952 <br /> <br />AWRllIAC PROCEDURE GUIDE <br />VI. CATEGORr:ES OF ELEMEIITS' <br /> <br />Def.1nitions. The Comprehensive Plan of development will <br />necessarily have elements which should be constructed or carried <br />out .as ea~ly as possible. Other elements of the.plan may not be <br />as attractive :from an economic or othe:r'standpoint, and should' be <br />assigned to a later stage for a long-range period of development. <br />Thsse considerations require that some breakdo'WIl of the elements <br />of the plan must be made in order to arrive at logical conclusions. <br /> <br />Therefore, the elements or units which are investigated in <br />developing the Comprehensive Plan of inwrovement will be divided <br />into the categories def1D.ed bsl()W (Reference: A'WRBllC I~eeting, <br />24 May 1951, Appendix r) :. <br /> <br />Category I <br /> <br />Those. which investigations have found to be feasible and de- <br />sirable to schedule and .carry out within a reasonably short future <br />period. of time.l . ** <br /> <br />a. By the Federal GovernIilent. <br /> <br />b. <br />sions. <br /> <br />By the state Gove~nt or its political subdivi- <br /> <br />c. <br /> <br />By private capital. . <br /> <br />Category II <br /> <br />Those which investigations have shollIl for variouB reasons <br />should not be scheduled and carried out within the reasonably near <br />futurel, but. may deserve further cOnsideration and .study at some time ** <br />in the future .in light of changing candi tions; These may .be feasi- <br />ble but not preeently desirable; ma,y'be dee-irable but notprBBentIy <br />feasible; or at this time may be neither feasible nor dBsirable. <br /> <br />a. By the Fedel'al Government, <br /> <br />b. By. the state Government or its political subdivieions. <br /> <br />c . By pri vate capital. <br /> <br />Isee page VI-4 "How Far to Look into the Future in the Prepara- <br />tion of the COllIPrehensive Plan" <br /> <br />** <br /> <br />VI-I <br />
The URL can be used to link to this page
Your browser does not support the video tag.