Laserfiche WebLink
<br />M <br />(!:l <br />\.l.l <br />.-\ <br />Q <br />G.\ <br /> <br />. <br /> <br />. <br /> <br />Below normal snowmelt runoff is expected for the spring of 1981. We presently <br /> <br />have no plans for storing Rio Grande water for the MRGCD. <br /> <br />E1 Vado Reservoir storage on Mareh 1, 1981, was as follows: <br /> <br />Rio Grande <br /> <br />(ine1udes 1,060 aere-feet dead storage) <br /> <br />49,940 acre-feet <br /> <br />San Juan-Chama water <br /> <br />57,809 aere-feet <br /> <br />MRGCD <br /> <br />270 aere-feet <br />29,305 aere-feet <br />10,583 aere-feet <br />8,559 aere-feet <br />5,565 aere-feet <br />44 acre-feet <br />1,161 aere-feet <br />2,322 aere-feet <br /> <br />City of Albuquerque <br /> <br />Public Serviee Company of New Mexieo <br /> <br />Santa Fe Metropolitan Water Board <br /> <br />Department of Energy <br /> <br />Twining <br /> <br />Village of Los Lunas <br /> <br />City of Espanola <br /> <br />Total <br /> <br />107,749 aere-feet <br /> <br />Channel <br /> <br />The Upper Rio Grande Rasin projeets Offiee's ehanne1ization O&M responsibility <br /> <br />extends along the Rio Grande from Velarde, New Mexieo, to the Narrows of <br /> <br />Elephant Butte Reservoir. <br /> <br />Maintenanee of the f100dway and conveyance channel consisted of phreatophyte <br /> <br />regrowth eontro1, repair of ehanne1 levees, removal of snags and sediment, <br /> <br />installation and rep1aeement of jetties, and graveling of berm roads and con- <br /> <br />veyanee channel slopes. The temporary plug at Tiffany, installed in <br />