My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11615
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11615
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:18:11 PM
Creation date
10/12/2006 5:04:43 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8510.100.40
Description
Rio Grande Compact Commission
Basin
Rio Grande
Water Division
3
Date
3/1/1981
Title
Water and Power Resources Service - Southwest Region - to Rio Grande Compact Commission - March 1981
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br /><0 <br />r-- <br />~" herbieides, mindful of environmental eoncern, may be the most effective and <br /> <br />...... <br />~ eost effeetive. Over the past 2 years, the Service, in cooperation with <br />c::' <br /> <br />E1aneo, DuPont, and Ve1sieo1, has made experimental app1ieation of tebuthiuron, <br /> <br />fosamine, hexazinone, and dieamba to mesquite and sa1teedar. The results of <br /> <br />fosamine on sa1teedar look very good while the soil-applied herbieides still <br /> <br />need additional time for proper evaluation. The experimental sites at Caba110 <br /> <br />are feneed to prevent aeeess by 1ivestoek. These evaluations will be eontinued <br /> <br />for the next 2 to 3 years. <br /> <br />Elephant Butte Reservoir and Rio Grande Channel <br /> <br />On Oetober 1, 1979, the projeet initiated a eomp1ete sediment survey of <br /> <br />Elephant Butte Reservoir for the purpose of updating area-eapaeity eurves and <br /> <br />tables, whieh, in turn, will allow the Rio Grande Compaet Commission to more <br /> <br />aceurate1y determine the amount of Rio Grande water delivered by New Mexieo to <br /> <br />Texas at Elephant Butte Dam. The tables and eurves are also required to' pro- <br /> <br />per1y allocate international waters between the United States and Repub1ie of <br /> <br />Mexieo. The survey of nearly 85 range lines via standard land survey and <br /> <br />hydrographie methods was eomp1eted by the end of February 1980. Draft eopies of <br /> <br />the new area capaeity tables are bein~ reviewed and should be ready for pub1iea- <br /> <br />tion by April 1981. <br /> <br />Caba110 Reservoir <br /> <br />A eomp1ete silt survey of Caba110 Reservoir was begun in October 1980. All <br /> <br />fieldwork for the survey was completed by the end of January 1981. Analysis of <br /> <br />data has begun and pub1ieation of new area capaeity tables for Caba110 is anti- <br /> <br />cipated for early 1982. <br />
The URL can be used to link to this page
Your browser does not support the video tag.