Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Approach 2 / Scenario 2 <br />Additional minimum streamflows provided in Case No. 82C\1340 were <br />operated under this Scenario. <br />Assumptions: <br /> <br />1) Includes all of the assumptions described for Scenario I. <br /> <br />2) Additional water was bypassed from Taylor River to meet the <br />streamflow requirements decreed in Case No. 82CW340. <br /> <br />3) Further, if necessary, releases from storage in Union Park <br />Reservoir were made to ensure the minimum strearnflows provided in <br />82CW340. (See Table / 111-5). <br /> <br />Approach 2 / Scenario 2a <br />Includes all of the assumptions in Scenario 2 except the operational <br />tilne of the pumps is changed from 12 to 18 hours. <br /> <br />Approach 2 / Scenario 2b <br />Includes all of the assumptions in Scenario 2 except the operational <br />time of the pump is changed from 12 to 24 hours. <br /> <br />-35- <br />