Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I. <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TABLE OF CONTENTS <br /> <br />Page <br /> <br />Letter of Transmittal <br /> <br />Li st of Tabl es <br /> <br />iv <br /> <br />Li st of Figures <br /> <br />v <br /> <br />I. PROJECT DESCRIPTION <br /> <br />A. Objective <br /> <br />1 <br />1 <br />1 <br />1 <br />2 <br />3 <br /> <br />B. Location <br /> <br />C. Project Background <br /> <br />D. General Project Description <br />1. Proposed Union Park Dam and Reservoir <br />2. Aqueduct - Union Park Reservoir to <br />Antero Reservoir <br />3. Taylor River Diversion <br />4-. Pumping I Generation Plant <br />5. Willow Creek Collection System and Tunnel <br /> <br />E. Taylor Park Dam and Reservoir <br /> <br />4 <br />7 <br />7 <br />9 <br /> <br />10 <br /> <br />II. RAW WATER SUPPLY REQUIREMENTS <br /> <br />15 <br /> <br />A. General <br /> <br />15 <br /> <br />B. Arapahoe County's Dependence on Ground Water <br />Supply <br /> <br />D. Estimated Design Par~neters and Assumptions <br /> <br />16 _ <br />17 <br />17 <br /> <br />C. Arapahoe County Comprehensive Pl an <br /> <br />E. Study Areas <br /> <br />18 <br /> <br />F. Water Supply Requirements <br /> <br />19 <br /> <br />III. HYDROLOGY AND PROJECT YIELD ANALYSIS <br /> <br />A. Introduction <br /> <br />27 <br />27 <br /> <br />B. Previous Studies <br />1. Ebasco (October, 1986) <br />2. W. W. Wheeler & Associates, Inc. <br />(July, 1989) <br />3. Colorado Water Resources and Power <br />Development Authority (May, 1989) <br /> <br />27 <br />27 <br /> <br />28 <br /> <br />29 <br /> <br />i <br />