My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11585
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11585
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:18:06 PM
Creation date
10/12/2006 5:03:54 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8445
Description
Union Park
State
CO
Basin
South Platte
Water Division
1
Date
10/1/1989
Author
WRC Engineering
Title
Engineering Report fo the Union Park Project Water Rights
Water Supply Pro - Doc Type
Report/Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />The hydroelectric project will utilize the existing Taylor Park <br />Reservoir as the lower reservoir and the proposed Union park <br />Reservoi r as the upper reservoi r. The Taylor Pa rk Reservoi r was <br />built and is owned by the United States Bureau of Reclamation. Its <br />purpose is to provide storage and del iver water to the Uncompahgre <br />Valley Water Users Association. <br /> <br />The Union Park Pumped Storage Hydroelectric Project will be operated <br />as a hydroel ectri c pumped storage facil ity to meet the servi ce needs <br />of electric util ities and to generate revenues to buy back power <br />during periods of low electrical demand to pump water from the lower <br />to the upper reservoirs. The water in Union Park Reservoir is then <br />conveyed to the South Platte River Bas.in for municipal uses, or used <br />to generate electricity with the hydroelectric Turbine/generator <br />during periods of high electrical demand as the water is returned to <br />the lower reservoir. <br /> <br />5. Willow Creek Collection System and Tunnel <br />Water from Willow Creek and its tributaries can be diverted by <br />gravity to Union Park Reservoir through the Willow Creek Collection <br />System and Tunnel. This gravity system will save the cost of power <br />to pump the same water from Taylor Park Reservoi r. Thi s system is <br />comprised of diversion facilities, open channels and a tunnel <br />carrying water from Bertha Gulch, three unnamed tributaries of Cow <br />Creek, and Willow Creek. A plan view of this system is presented in <br />Figure / 1-4. <br /> <br />-9- <br />
The URL can be used to link to this page
Your browser does not support the video tag.