My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11547
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11547
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:17:54 PM
Creation date
10/12/2006 5:02:38 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.116.I
Description
Fruitland Mesa Project
State
CO
Basin
Gunnison
Water Division
4
Date
10/7/1976
Title
Public Hearing - Draft Environmental Statement - Crawford-Colorado October 7-1976 - (Part 1 of 2)
Water Supply Pro - Doc Type
EIS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br />, <br /> <br />34 <br /> <br />i' I will read from the Upper Gunnison River h'ater Conservancy <br />\ 2 District. I would also like to include a letter written by <br />3 Craig A. Goodwin, the survivor of Hillie K. Goodw:in,after <br /> <br />4 whom the reservoir is named, which was sent to Carton Meek <br /> <br /> <br />5as president of the Fruitland Mesa Water Conservancy Board. <br /> <br />6 <br /> <br />MODERA~OR: You may do that provided it's all within <br /> <br />7 the lilrtits of ten minutes. <br /> <br />8 <br /> <br />MR. LAKE: I'll give you five and still make it. <br /> <br />9 <br /> <br />I'm representing the Upper Gunnison Water Conservatio <br /> <br />10 District, which organization represents everything in the <br /> <br /> <br />II Upper Gunnison River drainage. <br /> <br /> <br />12 Whereas, the Department of Interior will be conductin <br /> <br /> <br />13 a public hearing in the near future with regard to the con- <br /> <br /> <br />14 struction 9f the Fruitland Mesa Project, and whereas, the <br /> <br /> <br />15 Board of Directors of the Upper Gunnison River Water Conserv cy <br /> <br /> <br />16 District has previously gone Ion record as supporting said <br /> <br /> <br />17 project, and whereas, the Upper Gunnison River ~vater Con- <br /> <br />18 <br />servancy District believes that there has been no change of <br /> <br /> <br />19 circumstances ~lhich vlould change their prior position em said <br /> <br />20 project. No\., , therefore, be it resolved by the Board of <br />21 Directors of the Upper Gunnison River ~'iater Conservancy <br />22 District, tlu.,tthey go on record affirming their support <br /> as <br /> <br />23 <br />for said Fruitland l'lesa Project. It is ,further resolved that <br />24 <br />a copy of this resolution be delivered to the appropriate <br /> <br />25 <br />officials of the Bureau of Reclamation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.