My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11534
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11534
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:17:49 PM
Creation date
10/12/2006 5:01:15 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8270.100
Description
Colorado River Basin Water Quality/Salinity -- Misc Water Quality
Basin
Colorado Mainstem
Water Division
5
Date
1/1/1991
Author
USDOI
Title
Quality of Water - Colorado River Basin - Progress Report No. 15 - January 1991
Water Supply Pro - Doc Type
Report/Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
203
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />N <br />.... <br />-J <br />..... <br /> <br />Salinity Control Act of 1974 as amended, and <br />the Clean Water Act of 1977 as amended. Also <br />central to water quality issues are agreements <br />with Mexico on Colorado River system waters <br />entering that country. <br /> <br />The Water Qualit}, Act of 1965 (Public <br />Law 89-234) amended the Federal Water <br />Pollution Control Act and established a Federal <br />Water Pollution Control Administration (now <br />EPA). Among other provisions, it required <br />States to adopt water quality criteria for <br />interstate waters inside their boundaries. The <br />seven Basin States initially developed water <br />quality standards that did not include numeric <br />salinity criteria for the Colorado Ri~'er. primarily <br />because of technical constraints. In 1972, the <br />States agreed to a policy that called for the <br />maintenance of salinity concentrations in the <br />Lower Colorado River system at or below <br />existing levels, while the Upper Basin States <br />continued to develop their compact-apportioned <br />waters. The States suggested that Reclamation <br />should have primary responsibility for <br />investigating, planning, and implementing the <br />proposed Colorado River Basin salinity control <br />program. <br /> <br />The enactment of the Federal Water Pollution <br />Contral Act Amendments of 1972 affected <br />salinity contral in that the legislation was <br />interpreted by EPA to require numerical <br />standards for salinity in the Colorado River. In <br />response, the Basin States founded the Colorado <br />River Basin Salinity Control Forum (Forum) to <br />develop water quality standards including <br />numeric salinity criteria and a basinwide plan of <br />implementation for salinity control. The Basin <br />States held public meetings on the proposed <br />standards as required by the enacting <br />legislation. The Forum recommended that the <br />individual Basin States adopt the report, Water <br />Quality Standards for Salinity Including <br />Numeric Criteria and Plan of Implementation <br />for Salinity Control, Colorado Riuer System. <br />The proposed water quality standard called for <br />maintenance offlow-weighted average total <br />dissolved solids (TDS) concentrations of <br />723 milligrams per liter (mWL) below Hoover <br />Dam, 747 mgfL below Parker Dam, and <br />879 mgIL at Imperial Dam. Included in the plan <br /> <br />LEGAL ASPECTS 3 <br /> <br />ofimpl~mentation were four salinity control <br />units and possibly additional units, the <br />application of effiuent limitations, the use of <br />saline water whenever practicable, and future <br />studies. The standards are to be reviewed at <br />3-year intervals. All of the Basin States adopted <br />the 1975 Forum recommended standards. The <br />EPA approved the standards. <br /> <br />The Colorado River Basin Salinity Control Act of <br />1974 (Public Law 93.320) provided the means to <br />comply with United States obligations to Mexico <br />which included, as a major feature, a desalting <br />plant and brine discharge canal. These facilities <br />will enable the United States to deliver water to <br />Mexico having an average salinity no greater <br />than 115 parts per million (ppm) +/_ 30 ppm <br />(United States count) over the annual average <br />salinity of the Colorado River at Imperial Dam. <br />The act also authorized construction of 4 salinity <br />control units and the expedited planning of <br />12 other salinity control projects above Imperial <br />Dam as part of the basinwide salinity control <br />plan. <br /> <br />Public Law 98-569, signed October 30, 1984, <br />amends Public Law 93.320. The amendments to <br />the Salinity Control Act authorized the entire <br />U.S. Department of Agriculture program. The <br />amendments also authorized two new units for <br />construction under the Bureau of Reclamation <br />program. Additional units ,,';11 need to be <br />authorized to maintain the salinity standards <br />and have been included in the plan of <br />implementation for the salinity control program. <br /> <br />In 1990, the Forum reviewed the salinity <br />standards and recommended continuing the <br />construction of three of the four salinity control <br />units and 10 of the 12 projects identified in the <br />1974 Act, the placing of effluent limitations on <br />industrial and municipal discharges, and the <br />reduction of the salt loading effects of irrigation <br />return nows. The plan also called for the <br />inclusion of water quality management plans to <br />comply with Section 208 provisions after the <br />adoption of the plans by the States and approval <br />by EPA It also contemplated the use of saline <br />water for industrial purposes and future salinity <br />use control methods. <br />
The URL can be used to link to this page
Your browser does not support the video tag.