My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11484
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11484
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:17:38 PM
Creation date
10/12/2006 5:00:07 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8281.400
Description
Colorado River Studies and Investigations -- Colorado River Depletion Projections
Basin
Colorado Mainstem
Water Division
5
Date
2/13/1963
Title
Estimates of Average Annual Depletions in the Upper Colorado River Basin and Related Data -- 1910 - 2000
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />,',l <br /> <br /> <br />Source of Infonnation and Supplementary notes <br />for <br />Attachment A <br />. (Unless indicated otherwise, all citations are to <br />U.S. Bureau of Reclamation neports) <br /> <br />fJ' <br />~ <br />Q Item No. <br /> <br />1 Thru 3. Hearings on HR 2206, B7th Cong., p. 83. <br /> <br />4 Thru 7. Financial and 1conomic Analysis, Colorado River Storage <br />Project and Participating Projects (Dec.195B) CFtSP Analysis <br />3nd $enate Hearings for Public \forks appropriations, 1963 <br />Assumed herein that full depletion on the relatively smell projects <br />would take place upon completion of construction or in the same <br />year after the irrigation plant is scheduled to be in service. <br />On the larger projects (item 12 & 21), it is assumed that deple- <br />tionsl.'ill start when part of the irrigation plant is in service <br />I.dth a straij!,ht increase to full depletion by the year that <br />irrigators are scheduled to start making maximum payments. <br /> <br />B 2nd 9. Based on completion dates given in the .:.,encte Hearings on <br />Public Yorks hppropriations, 1963; and upon averace annual losses <br />Kiven in the CRSP Analysis, p.13 as follows; Navajo losses of <br />39,000 fl.F./Yr. starting in 1963, Flaming Gorge losses of 62,000 <br />A.F./Yr. starting in 1964 and Curecanti losses of 14,000 A.F./Yr. <br />starting 1967. <br /> <br />10 thru 12. (See note for item 4 thru 7) <br /> <br />13. <br /> <br />Reservoir evaporation losses at minimum power operating level vmuld <br />be about 300,000 A.~'./Yr. (based on an assumed evaporation rate of <br />5.0 re/yr). <br />Evaporation losses at norm81 operating level would be 576,000 A.Fj <br />Yr. (See GhSP Analysis, p. 12)' <br />Depletion schedule herein is based on the following assumptions: <br />a. Glen Canyon reservoir filling would begin in <br />the spring of 1963. <br />b. Reservoir would be at minimum power operating level <br />of 6.5 M.A.F. by end of 1964. <br />c. Reservoir ,iOuld fin to normal operatin[: level by 19$2. <br />d. A straight line increase in evaporation losses between <br />1964-82. <br /> <br />14. <br /> <br />Hearings on h.H. 2206, 87th Cong.,p.B3 (Blue "iver bettlement) <br />i'Bsumea straiFht line depIction increase between 1963-2000. <br /> <br />Hearings on H.R. 2352, h.J(. 2494 and S.72, B6th Cong., p.7S. <br />Assumed strairht line depletion increase bet~een 1963-69. <br /> <br />16. HearinGs on H. 11. 2352, B6th Conr;., p. 78. Assumed herein on <br />basis of construction schedule that depletions would begin in <br />1966 and increase on a straight line basis to full depletion <br />in 1970. <br /> <br />15. <br /> <br />- <br />
The URL can be used to link to this page
Your browser does not support the video tag.