Laserfiche WebLink
<br />Department offices in Denver, and at rlHPQ offices in Grand Junction and <br /> <br />'Denver. The above listed task reports form the basis for conclusions and <br /> <br />recommendations presented in the Preliminary FramevlOrk Plan. <br /> <br />SIGNIFICANT RELATED ISSUES <br /> <br />Over the past 12 months a number of significant issues pertinent to the <br /> <br />Study Area have been identified. To the extent Dossible, these issues are <br /> <br />the basis for the Preliminary Framework Plan and include: <br /> <br />vlater qual ity goal s and objectives <br />Implementation funding <br /> <br />Population projections <br /> <br />Energy resource development <br /> <br />Management/control of activities on Dublic lands <br /> <br />Diversions <br /> <br />Consolidation of wastewater treatment plant operation and maintenance <br /> <br />Control of agricultural pollution <br /> <br />Sal inity <br /> <br />cmlCLUSIOfiS <br /> <br />Some of the conclusions that were reached during preparation of the <br /> <br />framework plan include: <br /> <br />General <br /> <br />1. The Colorado West Area 2GB Plan will have a tremendous impact on the <br /> <br />residents of the Study Area in terms of: <br /> <br />The cost of construction wastewater control facilities and who <br />will receive Federal grants. <br /> <br />The enjoyment of specific water uses and the exclusion of other <br />uses. <br /> <br />The 1 eve 1 of development permitted, Ivhere people \-li 11 1 i ve, and <br />the lifestyle they will enjoy. <br /> <br />O(J2995 <br /> <br />- 4 - <br />