Laserfiche WebLink
<br />" <br />.~ '~.'" <br /> <br />Colorado River Flows near Colorado-Utah Stateline <br />with Dallas Creek and West Divide Projects <br />(cfs).lI <br /> <br />Month <br /> <br />Avera!!;e Monthly <br /> <br />Maximum Monthly <br /> <br />Minimum Monthly <br /> <br />Oct <br />Rov <br />Dee <br />Jan <br />Feb <br />Mar <br />Apr <br />. May <br />Jun <br />Jul <br />Aug <br />Sep <br /> <br />3772 5471 2419 <br />4W8 5B9 3M3 <br />4205 5520 2739 <br />3988 4990 2825 <br />4096 5531 2761 <br />3929 5712 2702 <br />5209 12,453 1963 <br />11,730 25,030 5299 <br />14,645 32,975 3265 <br />6"3 U,~3 18~ <br />3413 7971 1478 <br />3207 5210 1657 <br />11 Based on gage readings and correlated data for period <br />1952-1973. Gunnison River data has been adjusted to reflect <br />present level of development, the operation study for the West <br />Divide project carries impacts on the river to the Cameo gage, <br />approximately seven miles upstream from the town of Palisade, <br />Colorado. The preliminary data in these tables are based on <br />the assumption that flow changes at the Colorado-Utah State- <br />line due to the West Divide Project will be of the same <br />magnitude as at the Cameo gage. The West Divide operation study <br />also assumes a 100 cfs checkback at the Orchard Mesa Powerplant <br />and releases from Green Mountain Reservoir only to the West <br />Divide Proj ec t . <br /> <br />I" <br /> <br />" <br />~; <br /> <br />:, <br /> <br />'I: <br /> <br />:". <br /> <br />,.. <br />f-. <br /> <br />( <br />~ <br /> <br />f.: <br />;~ <br /> <br />~~ <br />~ <br />~ <br />j'" <br /> <br />:r-. <br />