Laserfiche WebLink
<br />, <br /> <br />'. .' ~, <br />... <br /> <br />Colorado River Flows near Colorado-Utah Stateline 1/ <br />with Dallas Creek., West Divide, and Dominguez Projects - <br />(ds) <br /> <br />Month <br /> <br />Average Monthly <br /> <br />Maximum Monthly <br /> <br />Minimum Monthly <br /> <br />, Oct <br />Nov <br />Dec <br />Jan <br />Feb <br />Mar <br />Apr <br />May <br />Jun <br />Jul <br />Aug <br />Sep <br /> <br />3659 5995 2246 <br />4007 5107 3109 <br />3869 5691 2694 <br />3802 4951 2782 <br />3996 5485 2715 <br />3986 6915 2638 <br />5251 12,203 2100 <br />11,502 22,559 5191 <br />14,486 27,728 3265 <br />6288 22,141 1976 <br />3413 5894 1479 <br />3089 4835 1657 <br />1/ Based on gage readings and correlated data for period <br />1952-1973.Gunnison River data has been adjusted to reflect present <br />level of development. The Dominguez operation studies have the <br />Dominguez Project superimposed over the adjusted historic data. <br />The operation study for the West Divide Project carries impacts <br />on the river to the Cameo gage, approximately seven miles up- <br />, stream from the town of Palisade, Colorado. The preliminary <br />data in these tables are based on the assumption that flow <br />changes at the Colorado-Utah Stateline due to the West Divide <br />Project will be of the same magnitude as at the Cameo gage. <br />The West Divide operaton study also assumes a 100 cfs check- <br />back at the Orchard Mesa PoW'erplant and releases from Green <br />Mountain Reservoir only to the West Divide Project. <br /> <br />t. <br /> <br />[: <br />~ <br /> <br />',', <br /> <br />;, <br /> <br />'1: <br />" <br />* <br />~~ <br /> <br />, <br /> <br />'. <br /> <br />f:- <br /> <br />i'- <br /> <br />~~~ <br />~t <br />~ <br />" <br />t~ <br />$ <br /> <br />,. <br />0' <br />