Laserfiche WebLink
<br />21 <br /> <br /> <br />g,j_ C~IU it k INutt ? <br /> <br />The present planning report dated January 1967 constitutes <br /> <br /> <br />the final Report of the Regional Director. It is a revision of a <br /> <br /> <br />preliminary draft issued in August 1966 which was distributed to <br /> <br /> <br />the Commissioner of Reclamation in Washington, the Chief Engineer <br /> <br /> <br />in Denver, the field offices of other Federal agencies, and to <br /> <br /> <br />State and local agencies for review. <br /> <br /> <br />All review comments were analyzed and the report was revised <br /> <br /> <br />as necessary to become the final report of the Regional Director. <br /> <br /> <br />That report will be resubmitted to the Commissioner of Reclamation <br /> <br /> <br />who initiates formal processing. <br /> <br />. <br /> <br />Such further processing normally involves the following <br />steps: (1) review of the report in Washington by other Interior <br /> <br /> <br />Department agencies and by responsible Interior Department <br /> <br /> <br />officials; (2) adoption of the report by the Secretary of the <br /> <br /> <br />Interior and its formal transmittal to, and ..review by, the affected <br /> <br /> <br />States; the Secretary of the Army, and other Departments and Offices; <br /> <br /> <br />(3)campletion of a final report by the Secretary of the Interior, <br /> <br /> <br />after consideration of the comments received; and (4) submittal <br /> <br /> <br />of the report to the President for review by the Bureau of the <br /> <br /> <br />Budget to determine applicability of the plan to the Administration's <br /> <br /> <br />fiscal policy. <br /> <br />. <br />