Laserfiche WebLink
<br /> <br />20 <br /> <br /> <br />. <br /> <br />In the event that the cooperating agencies and the State of <br /> <br /> <br />Colorado complete their findings without formulating a more <br /> <br /> <br />economical alternative plan for control of Bijou floods in the <br /> <br /> <br />South Platte River Valley, the facilities to divert Bijou Greek <br /> <br /> <br />into the Narrows Reservoir could be constructed at any time to <br /> <br /> <br />be complementary to upstream works. No change would be required <br /> <br /> <br />in the design of Narrows Dam; however, the allocation of reservoir <br /> <br /> <br />storage would require modifications to compensate for the added <br /> <br /> <br />sediment which would be> carried into the reservoir from Bijou <br /> <br /> <br />Creek. <br />