My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11415
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11415
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:17:21 PM
Creation date
10/12/2006 4:57:08 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.470
Description
Pacific Southwest Interagency Committee
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
3/25/1957
Author
H A Hunt
Title
The Washoe Project - Statement of H A Hunt Before the Meeting of the PSIAC March 25 1957
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />0iJ2J37 <br /> <br />. <br /> <br />. <br /> <br /> <br />Under tl1.~ adopted plan tl1.e Washoe ];lroject would be integrated wi tl1. <br />the existing Truckee River storage and NeWlands projects. It would also <br />be coordinated witl1. tl1.e Truckee River chapnel in:\Provements proposed by <br />tl1.e COIllS of Engineers and autl1.orized in the Flood Control Act of is/54 <br />witl1. tl1.e provision tl1.at the authorization would not become effective <br />unless and until the Washoe reclamation project had been authorized. <br />Copies of tl1.e report of September i954 were transmitted to the States <br />of Nevada. and California and to the Secre.tary of the Amy as req.Uired by <br />law. Copies were also transmitted to otl1.er interested Federal agencies. <br />Comments received from the various State and FederaJ. agencies were favor- <br />able. Bills to authorize construction of the Washoe project were intro- <br />duced in botl1. Houses of Congress and subcommittee hearings were held. The <br />project was autl1.orized under Public Law 858 which was approved by tl1.e <br />President August 1, 1956. <br />The authorizing act for tl1.e Washoe project inCluded a number of amend- <br />ments that grew out of congressional hearings and were not a part of tl1.e <br />Bureau of Reclamation's Feasibility Report of September 1954. An addi- <br />tional nonreimbursable expenditure of $2,000,000 was authorized for the <br />construction of facilities for the development of fish and wildlife <br />resources including facilities required to increase minimum water releases <br />from Lake Tahoe and to restore the Pyramid Lake fishery. These facilities <br />will include a reservoir on ProssEir Creek to provide for the increased <br />Lake Tahoe releases through an exchange of water and a fish hatchery just <br />below Watasheamu Dam on the Carson River to help restore the Pyramid Lake <br />fishery. This hatchery will be used p:rimarily to stock the lake and its <br />tributaries. <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.