My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11413
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11413
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:17:20 PM
Creation date
10/12/2006 4:57:05 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8443.600
Description
Narrows Unit - Studies
State
CO
Basin
South Platte
Water Division
1
Date
2/1/1963
Author
Bor,
Title
Site Selecion Presentation to the South Platte Steering Committee
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />15. <br /> <br />10. <br /> <br />A portion of the increased river flows will be diverted under <br />existing priorities by acres currently dry-farmed under <br />existing ditch systems. Such diversions will occur with or <br />without the construction of Narrows Dam or Weld County Dam. <br /> <br /> <br />11. <br /> <br />Up to and including the intermediate time level Bureau of <br />Reclamation project water supply will be diverted to only <br />those acres presently irrigated. (Present acreage in Main <br />River Valley is 362,000 acres). , <br />' , <br /> <br />l2. <br /> <br />Additional supplies will be routed to the highest ditches <br />having supplemental needs in accordance with criteria No. 3 <br />, regardless of priority. These criteria are based on the <br />principle that at some future date the basin water supply, <br />with appropriate control and husbandry, will be adequate <br />'for all presently irrigated lands. <br /> <br />13. <br /> <br />Two Forks Bam and Reservoir will have been built and will be <br />in operation for the study conditions considered for site <br />selection. (This facility, or a comparable facility, is <br />required to assure the M&I eJCchange flows used in our studies). <br /> <br />14. <br /> <br />Denver will construct facilities to furnish the Burlington <br />system with their historic water supply. (This criterion <br />assumes that the proposed new sewage treatment plant will <br />be physically located below the existing Burlington diversion <br />dam) . <br /> <br />The scope of hydrologic analysis for the tributary basins will <br />be confined to: (a) consideration of effects of potential <br />Cache la Poudre Project as studied by the Bureau of ReClamation, <br />(b) consideration of full operation of Colorado-Big Thompson <br />Project, (this project was in only partial operation during the <br />period 1952-l957), (c) allowances for additional depletions <br />in tributary basins (this allowance has been computed as 10 <br />percent of ,the recorded flow at the mouth of the major <br />tributaries during those months when there were apparent, <br />storable flows of that magnitude at either Weld County or <br />the Narrows dam sites). <br /> <br />16. The amount of basin pumping varies directly as the availability <br />of surface supply for irrigation diversions. For instance, <br />as surface supplies increase, pumping will decrease. <br /> <br />17. The consumptive use of municipal water will be 30 percent. <br /> <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.