My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11366
CWCB
>
Water Supply Protection
>
DayForward
>
1-1000
>
WSP11366
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 8:52:04 PM
Creation date
10/12/2006 4:55:59 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8040.200
Description
Section D General Studies-Energy
Date
10/1/1976
Author
CWCB
Title
Hayden Project
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1 ' <br />/ <br /> <br />Federal Grants <br />State Funds (to be repaid by use charges <br />Total <br /> <br />$300,000 <br />300,000 <br />$600,OUU <br /> <br />R~CG!.~h,NDATION MlD PRIORITY <br /> <br />T!1e town of Hayden has an immediate n2ed to reconstruct and improve <br />its water system in order to cope with the preserot and future needs for <br />water, The town can make yearly payments on a water system, but cannot <br />raize the initial capital investment, The communities of the Yampa <br /> <br />Vall,"y are experiencing a true "boo;n town" period. Considerable state <br /> <br />and federal azsistance will be required to keep pace with the population <br /> <br /> <br />and industrial expansion of the area, <br /> <br /> <br />It appears that approximately $300,000 in federal grants can be <br /> <br /> <br />~ccured if the state of Colorado will participate in the project con- <br /> <br /> <br />3tru~tion to the extent of the remaining required amount of $:}OO;OOO. <br /> <br />If funds are made available to the Colorado Water Conservation Board <br /> <br />Construction Fund in that amount, water use charges would be levied by <br />the state at the rate of $20;l66'per year for 20 years, for a total <br />repay<ncnt of $403,320. <br /> <br />It is recommended that the Hayden project be submitted to the lS77 <br />General Assembly as priority number three, <br /> <br />FLS:= <br /> <br />0308 <br /> <br />-3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.