My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11355
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11355
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:17:06 PM
Creation date
10/12/2006 4:55:30 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.114.I
Description
Dolores Participating Project
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
11/2/1982
Author
USDOI-BOR
Title
Finding of No Significant Impact (FONSI) for Dolores Project Road Upgrading - Dolores Project-Colorado
Water Supply Pro - Doc Type
EIS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Response: <br /> <br />,.<t",-- <br />-'."'.'1 <br />~-"';;y <br />Reference to wood waste-disposal <br />is meant to establish a baseline <br />the area, and will remain in the <br /> <br />.....f'~ <br />"-.'!.--'-;- <br />burners and open-burning disposal areas <br /> <br />for existing air quality conditions in <br /> <br />environmental assessment. <br /> <br />11. Comment: <br /> <br />See Page 6, D. Wildlife, Fourth Paragraph. Although the Ormiston Point <br />"Road" is in a primitive condition, it is an existing permanent system <br />road which would be reconstructed. <br /> <br />Fifth paragraph, second sentence. <br />(Dolores-Norwood) is limited in 40 <br /> <br />Note that the "National Fores t" road <br />mph. <br /> <br />Response: <br /> <br />See response to Comments 1 aud 8. <br /> <br />12. Comment: <br /> <br />See Page 6, E. Threatened and Endangered Species. <br />Is this "Project area" referred to the Dolores Project or the subject road <br />upgrading project? The Dolores Project area does not cover all of the area <br />for the proposed road upgrading. <br /> <br />Response: <br /> <br />The project area is the area encompassed by the road upgrading. For the <br />purpose of Section 7 Compliance the Dolores Project area also encompasses <br />the area of the road upgrading. <br /> <br />13. Comment: <br /> <br />See Pages 6 and 7, F. Cultural Resources. <br />The first paragraph is not pertinent to the proposed road upgrading pro- <br />ject as the subject roads are outside of the Anasazi Archeological <br />District. <br /> <br />Response: <br /> <br />The paragraph is useful as background information of the areas and <br />Reclamation's cultural resource program therefore the paragraph will <br />remain in the document. <br /> <br />14. Comment: <br /> <br />See Pages 7 and 8, Mineral Resources. <br />As commented on previously, the Ormiston Point gravel site will re- <br />quire a separate environmental assessment and further investigation test- <br />ing and mapping prior to allocation for gravel development. An operating <br />plan for the site will determine development area and rehabilitation work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.