Laserfiche WebLink
<br />Woodward.Clyde Consultants <br /> <br />OS'iJ <br /> <br />TABLE OF CONTENTS <br />(Continued) <br /> <br />FIGURE 1 - LOCATION MAP NARROWS RESERVOIR (USBR) <br />FIGURE 2 - GEOLOGY CROSS SECTION ALONG DAM AXIS (USBR) <br /> <br />FIGURE 3 - FEASIBILITY DESIGN DRAWING (USBR) <br />FIGURE 4 - STABILITY DRAWING (USBR) <br /> <br />FIGURE 5 - STABILITY ANALYSES DOWNSTREAM SECTION <br /> <br />FIGURE 6 - CONSTRUCTION MATERIALS--GENERAL LOCATION <br />MAP OF AREAS TESTED (USBR) <br /> <br />FIGURE 7 - SEEPAGE ANALYSIS FOR STABILITY OF NARROWS DAM (USBR) <br /> <br />FIGURE 8 - NARROWS DAM REVIEW,SEEPAGE AROUND RIGHT ABUTMENT <br /> <br />FIGURE 9 - CLASSIFICATION OF SOILS SENSITIVE TO SOIL STRUCTURE <br />COLLAPSE AND SETTLEI1ENT UPON SATURATION <br /> <br />TABLE 1 - NARROWS DAM TABLE OF STABILITY PARAMETERS (BY USBR) <br /> <br />TABLE 2 - NARROWS DAM PARAMETERS FOR STABILITY ANALYSIS BY WCC <br /> <br />APPENDIX A - ATTENDANCE RECORD NARROWS DAM BRIEFING AND REFERENCES <br /> <br />ii <br /> <br />fit <br />