My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11304
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11304
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:16:54 PM
Creation date
10/12/2006 4:52:24 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.50
Description
CRSP - Power Marketing
Basin
Colorado Mainstem
Date
2/1/1986
Author
USDOI/WAPA
Title
SLCA Integrated Projects Marketing and Allocation Criteria
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />abcve. The request should specify (t) the desire on the part of the <br />applicant to participate in the allocation process, and (2) the kWh/kW <br />desired for both the summer and winter seasons. This last item will <br /> <br />be used in determining the amounts of firm capacity to be associated <br /> <br />with seasonal energy allocations. Since an adjustment on the energy <br /> <br />allocation limit will be allowed for:those customers who can <br /> <br />demonstrate that energy usage for 19~0-82 was reduced as the result of <br />conservation efforts, any such app1i4ants that may be affected by the <br />allocation limit must also submit th~ required documentation with any <br />i <br />application. An application must beireceived by Western's SLCAO from <br />each potential allottee by close of business on (INSERT DATE 60 DAYS <br />AFTER PUBLICATION IN THE FEDERAL REGtSTER). <br /> <br />2. Determination of Allocations i <br />Shortly after the deadline for submi~ting applications for power, <br />Western will publish proposed allocations to all qualified applicants <br />in the FEDERAL REGISTER. The notice ,will seek comments on the <br /> <br />proposed allocations. <br /> <br />Once comments are considered and any:necessary adjustments made, the <br />Administrator will allocate energy and associated capacity under the <br />terms of the Criteria to all qualified applicants and will publish the <br />final allocations. <br /> <br />3. Contract Negotiations <br />Having established allocations, Western will begin developing contract <br />language wi th the a 11 ottees. Prelimi:nary draft contracts wi 11 be <br /> <br />41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.