<br /> <br />Psge 7 <br /> <br />CURECANTI STORAGE UNIT, COLORADO <br /> <br />The CUrecanti Unit, located in west-central Colorado, is one of four <br />authorized storage units of the Colorado River Storage Project. The <br />main project features include Blue Mesa, Morrow Point, and Crystal <br />D3.tns, Powerplants, and Switchyards. The primary purposes of the unit <br />are regulation and storage offlood flows of the Gunnison River and <br />generation of hydroelectric power from three powerplants with a com- <br />bined nameplate rating of 208,000 kilowatts. In addition, the project <br />will provide fish and wildlife and recreation benefits. <br /> <br />Following is the status of construction work at June 30, 1967: <br /> <br />Percent <br />Complete <br /> <br />Blue Mesa IA>m and Reservoir 99 <br />Blue;> Mesa Powerplant and Switchyard 97 <br />Morrow Point IA>m & Reservoir 89 <br />Morrow Point Powerplant and Switchyard 58 <br />Crytal Dam Access Road 100 <br /> <br />Blue ~~sa Dam, west of Gunnison, ColoradO, began storing water on October 27, <br />1965. The powerplant is scheduled to go into operation in the fall of <br />1967. When filled, Blue Mesa Reservoir will contain 940,800 acre-feet of <br />water. The powerplant will have a generating capacity of 60,000 kilowatts. <br /> <br />The Morrow Point Dam and Powerplant are now being constructed under a <br />$15.4 million contract awarded in May 1963. The dam and and power- <br />plant are scheduled for completion late in fiscal year 1968. <br />Work continued in Fiscal Year 1967 on the contract to install two generators <br />of 60,000 kilowatts capacity each for the M:lrrow Point Powerplant. The <br />120,000 kilowatt powerplant is being constructed as an underground installa- <br />tion, the first such plant in Reclams.tioll history. It is being carved. out <br />of the left wall of the Gunnison River Canyon Just below M:lrrow Point Dam. <br /> <br />The Cl'ystal Dam and Powerplant are scheduled for the start of construction in <br />late 1969 and the powerplant is scheduled to be in operation by late F'i 1973. <br />. The powerplant will have an installed capacity of 28,000 kilowatts. Crystal <br />Reservoir is planned to re-regulate the flows of the Gunnison River to permit <br />the most efficient operation ot the power facilities at Morrow Point Dam. <br />This permitted an increase in Morrow Point generating capacity from 60,000 <br />kilowatts to 120,000 kilowatts. The Crystal Dam access road was completed <br />on January 12, 1966. <br /> <br />Recreational facilities are being built by the National Park Service at <br />the Center Point Site adjacent to U. s. 50 on Blue Mesa lake. A boat- <br />launching ramp is completed and in use along with other facilities which <br />includes a campground and picnic development ~nd marina grading. <br /> <br /> <br />