My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11280
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11280
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:16:49 PM
Creation date
10/12/2006 4:52:06 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.101.09B
Description
Glen Canyon Dam/Lake Powell
State
AZ
Basin
Colorado Mainstem
Date
12/1/1990
Author
BOR
Title
Management Plan for Preparation of Glen Canyon Dam Environmental Impact Statement
Water Supply Pro - Doc Type
EIS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />43170 <br /> <br />Fedenl iteRlater I Vol. 54. No. 207 I Friday, October 27, tOB9 I NollceB <br /> <br />Bureau of RaclamatlDn <br /> <br />FO" FURTHER INFORMAnON CONTACT: <br />Mr. Sieve Robinson. Director. Colorado <br />River Studies and Initialives Office. U.S. <br />Bureau of Reclamation. 125 South Slale <br />Street. P.o. Box 11568. Salt Lake City. <br />Utah 84147. lelephone: (801) 524-3595. <br /> <br />SUPPLEMENTARY INFO~MATION: Glen <br />Canyon Dam was authQrized and <br />con~lrucled prior to the enactment of <br />;liEPA. Consequenlly. no NEPA <br />uocumenlallon on the overall operations <br />of the fClciJily has ever been completed, <br />Reclnm"uun completed an <br />En\'lronmenlal Assessment/finding of <br />No Significanllmpact on the upratiag <br />and Ihe rewinding of the generators al <br />Glen Cdlwon Dam 1n 1982, The <br />Oepartme-nl of Ihe Inlerior Initiated the <br />Glen Can van Environmental Studies in <br />1982 with'lhc objective 01 collecting the <br />tecnmcallnformulion requireu to H~"eS9 <br />!he Impacl of operatIOns on the naturui <br /><-inJ recreatIon resources In Glen <br />Cdny"n and Grand Canyon. The Glen <br />Canyon Er.\'lronmental Sludies hCtv~ <br />produced mul"ple technical reports on <br />lhr> Impacts of high anu steady now <br />operations, and stuules have r<:cently <br />ber>n InlllCllcd on the Impacts of <br />nuclualm~ Clnd minimum nows, <br /> <br />Anyone Interested in more <br />inlonnation concerning the studie. or <br />who has suggeRtions as to significant <br />environmental issues should contact Mr, <br />Robinson al the above addre... <br />The DEIs is expected 10 be completed <br />and available for review and comment <br />by Ihe end 011991. <br />Joe D. HaU. <br />Deputy CommIssioner, <br />IFR Doc. 89-25337 Filed lo-2H9: B:4S ami <br />!IIWNa COOl U10-0t--M <br /> <br />AnalYIII of thl Oparatlng Crlterll .nd <br />Altematlvel 01 Glan Clnyon DIm, AZ, <br />Colorado Rlvlr storlg. Prol.ct <br /> <br />AGENCY: Bureau 01 Reclamation (UsBR). <br /> <br />AcnON: Notice of intent to prepare a <br />draft environmental impact statement. <br /> <br />SUMMARY: Pursuant to section 102(2I1C) <br />of the National Environmental Policy <br />Act 011969 (NEPAl. as amended. Ihe <br />Bur"au 01 Reclamation (Reclamatinnl <br />proposes 10 prepare a draft <br />environmental Impact statement (DEIS) <br />to analyze the existing operating criteria <br />of Glen Canyon Dam. Arizona, Colorado <br />River Storage Project. and 10 develop a <br />set of environmental criteria that will be <br />used by lhe Department of the Intenor <br />during the development of [he AnnUal <br />Opera ling Plan for the operatIOn of Glen <br />Canyon Dam. This informatIOn IS <br /> <br />necessary 10 datennine specific options <br />10 the operation of Glen Canyon Dam <br />that could be enacted to minimize. <br />consiSlent with law. Ihe impact of <br />operation on the natural resources of the <br />Grand Canyon. The statemenl will <br />discuss: the requirements of the <br />Colorado River Compact. Colorfldo <br />River Storage Project Acl. End1ngered <br />SpecIes Act. National Park Service <br />mandates. recreation isoues, nr.d <br />requirements of the Department of <br />Energy. <br />The DEIS will presenl an "nalyais 01 <br />the impacts of various alternative <br />mar.agemenl practices, including <br />exi3ting ones, as affected by changes in <br />the operating crileria lor Glen Canyon <br />Dam, <br />Reclumalion Will conduct scopmS <br />meellnS5 10 several locations 10 obtam <br />informatiC'n on which to base <br />management options to be analyzed In <br />the ;liEPA orocess. Reclamation WIll be <br />the lead a~ency in the development of <br />the DEIs. The U.S. Fish and Wildlile <br />Service, (he Nat.ional Park SerVice, and <br />Western Area Power Administration of <br />the Departmenl of Energy will be <br />cooperatlOa agencies. <br />O"'TE: The formal public involvement <br />process and scoping efforts will begin In <br />January 1990, <br />AOORESSES: The scoping meetings will <br />be held in severallocalions and Will be <br />published when the specific locations <br />are selected, <br /> <br />17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.