My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11280
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11280
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:16:49 PM
Creation date
10/12/2006 4:52:06 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.101.09B
Description
Glen Canyon Dam/Lake Powell
State
AZ
Basin
Colorado Mainstem
Date
12/1/1990
Author
BOR
Title
Management Plan for Preparation of Glen Canyon Dam Environmental Impact Statement
Water Supply Pro - Doc Type
EIS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />of ths EIS effort, gensrally as diagrammed on <br />the next page. Participation of the tsam <br />memben will be formalized with a <br />MemorllIldum of Un den tanding (MOm <br />between Reclamation IIIld each cODperating <br />agency. Participation Df Reclamation's <br />Denver Office - AsBistant Commissioner - <br />Resources Management (ACRM) will be <br />fDrmalized in a Service Agreement with <br />Reclamation's Upper ColoradD Region. <br />All tsam members are expected to devDts <br />highest priority, if not full time, to the Glen <br />ClIIlyon Dam EIS. The initial team meeting <br />WBlIIIl EIS training session IIIld a detailed <br />organizational discussion. FDllDwing <br />meetings included field orientatiDn and <br /> <br />briefings by GeES researchsrs. Ths <br />EIS team is encouraged to work with <br />GeES researchen IIIld with the Senior <br />Scientist, in order to obtain IIIld correctly <br />present technical informatiDn in the <br />EIS analysis. <br /> <br />Team Members and General <br />Assignments <br /> <br />Although the team will work as a group to <br />discuss and lIIlalyze impacts, each person has <br />Bpecific topics assigned for the EIS <br />preparation, generally as follows: <br /> <br /> Name <br /> ThDmas Slater <br /> Suzanne Garcia <br /> Mike O'Donnell <br />. Mary Ann Facer <br />Raymond Gunn <br /> Jerry Mitchell <br /> Jan Balsom <br /> Debra Bills <br /> Frank Baucom <br /> Larry Riley <br /> DillIle Cherry <br /> Jane Bremner <br /> Bruce Glenn <br /> Tim Randle <br /> Jim Wilson <br /> Craig Phillips <br /> Mike Roluti <br /> Kent Shuyler <br /> Debbie Saint <br /> Mike Armbruster <br /> Gary Baker <br />. <br /> <br />Agency <br />Reclamation SLC <br /> <br />Reclamation SLC <br />ReclamatiDn SLC <br /> <br />Assignments <br />NEPAManager <br />Administrative Coordinator <br /> <br />Description of alternatives, various <br />Dther topics, assistance with <br />research interpretation <br /> <br />Reclamation SLC Public Information Specialist <br /> <br />NPSSLC ~ <br />NPS Grand ClIIlyon Recreation - cultural resDurces <br />NPS Grand Cl\Ilyon <br /> <br />FWS Phoenix ]- Fish I\Ild wildlife, including <br />FWS Phoenix endl\Ilgered species <br />AGF Phoenix I\Ild trout <br /> <br />WeBtsm SLC Power production IIIld UBe <br /> <br />Hopi Tribe Tribal concerns <br /> <br />Reclamation Den Denver Office activity manager <br /> <br />Reclamation De~ <br />Geological Survey Sediment <br />Cheyenne <br /> <br />Reclamation Den Hydrology <br /> <br />Reclamation Den <br />Reclamation Den <br />Reclamation Den <br />Reclamation Den <br />Reclamation Den <br /> <br />Power reBources <br /> <br />Economics, except power <br /> <br />Social considerations <br /> <br />Impact asseSBment assistance <br /> <br />Technical Writer, document prepar- <br />atiDn, and printing arrangements <br /> <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.