My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11272
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11272
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:16:46 PM
Creation date
10/12/2006 4:51:56 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8273.100
Description
Colorado River Basin Salinity Control - Federal Agencies - Bureau of Reclamation
Basin
Colorado Mainstem
Water Division
5
Date
7/1/1981
Author
DOI BOR
Title
Salinity Update - July 1981 - A Quarterly Report on the Colorado River Water Improvement Program
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />The general concluSion 'Nas that det'P <br />well Injectron IS technically en- <br />vHonmentally and economically amac- <br />tlve Pnase 11 ""Ill De completed by <br />August 1981 and WIlt Include detailed <br />designs and cost estimates lor test <br />disposal tacilll'es The COnlractOr Will <br />also prOVide aSSISlance to the Bureau on <br />OOta,nlng Ihe 'eQulfed permIts Subse- <br />Quently construction 01 an '"lechon <br />well, !i1trallon plant and pipeline 'NIl! be <br />necessary to lesltne lnJ€ctlon formation <br />lor disposal capacity With lhatlnlorma- <br />lion horn Ihe Inlecllon lest, a deCISion <br />Will be made on ""hemer to use deep well <br />Inlectlon as a p€rmilnpnlld,sposal methOd <br />Welll,eld testing and ve..l,cahon will <br />continue. although stud,as on evapora- <br />tion pond diSPosal w,ll be suspended <br />until more Inlormatlon IS available on <br />deep well injection <br /> <br />Paradox Valley Technical <br /> <br />Team <br /> <br />Rege leach. ErrOl Jensen Ronald <br />Pierce and Donald HubbS 01 the <br />Durango PrOWCIS OU,ce's Water <br />Resources BranCh are th", nucleus olthe <br />Pafado~ Valley ol;mnmg studieS The <br />team IS ....Orklng on coordmahng <br />engll'leerll'lg and construction contracts <br />publiC and IntEragr>ncy II'lvolvement <br />hydrologiC studies numerous data <br />collection programs as ....ell as opera- <br />tion and mall'ltenance 01 lacllltles In, and <br />assOCiated wlll'1 the well tleld <br />Headll'lg tht' team IS Rege leach A1ter <br />graduallng horn Pennsylvania State <br />UniverSity In 1973 w'ln a OlC'qree II'l water <br />reSources engmel'rlng Rege began hiS <br />career as slall e"lglneef With a public <br />....ater Ullllty II'l Harflsburg Pennsylvania <br />He starleO worklnl; w'll'1 ReclamallOI1 In <br />:he Durango Water Resources Bral1ch In <br />t975 <br />Water Resources BranCh Ch,el ErrOl <br />Jensel1 gradualed from Utah State <br />JnlverSlty m 1969 With a CIVil engll'leef- <br />ng degree and m 1971. completed a <br />nasters CIVil engll'leenng program ma- <br />ormg II'l water Quallt" Irom the same <br />,chaol He begal1 hiS Reclamation <br />:arE.'er at the Cel1tral Uta" PrOjeC1S <br />)tI,ce In Pro~o, Ulan II1 1970 ErrOl <br />ral1sferred 10 thE' Dural1goottlce In 1972 <br />,l'1ere he wori<.ed In the Water Resources <br />IranCh. prmClpally on tl'le Parado~ <br /> <br /> <br />IJ ~ <br /> <br />, <br />__,1 <br /> <br /> <br />Valley proJE'ct He spent two years <br />workmg il1 the Colorado RlvE'r Water <br />Qua lit)' Glflce at the E&R Center and <br />moved back to the Durango Prolects <br />GHice In 1979 to assume hiS present <br />pOSl1lon ErrOl IS a Registered <br />ProfeSSional Engll'leer m Colorado <br />Ron PIerce began working lor <br />ReClamatiOn In 1959 on the Central Utan <br />PrOject tlrst m the Water Resources <br />Brancn and then m the land Class.llca- <br />tlon BranCh In 1973, Ron moveo to <br />Durango Projects Otllce and began <br />wOfk With the ParadO~ Valley Unit Ron <br />has been workmg wltn the prOject smce <br />1973 and has been mvolved 10 most 01 <br />the data collection and planning ac- <br />llvltles He IS currently respOnS.ble tor <br />I,el(l actiVIties and data collectiOn In the <br />prOlect area <br />Don HubbS started hiS Reclamation <br />career as a surveyor m the Montrose <br />Construction Ofllce II'l 1972 worl(lng <br />mainly on Crystal Dam In 1977 Don <br />transferred to the DUChesne Construc- <br />tIon Glllce as a surveyor and InspeClor <br />on the Central Utah PrOject Don. born <br />and ralsed In the P;Hado~ Valley area <br />returned home In 1979 to work as a <br />hydrologiC techniCian on !he Parado~ <br />prOject He workS lul111me at the pro/ecl <br />site and lS responSible lor collectIon 01 <br />hydrologiC data and operation and <br />mall'ltenance 01 the well Ileld laCllltles <br /> <br />Reports Prepared For Forum <br /> <br />The ColoradO River BaSin Salmity <br />Control Forum constantly lOOkS lOr ways <br />to e~ped'te completion 01 the salinity <br />contrOl units Dunng a recent review 01 <br />tI'1e status 01 the overall prOgram they <br />realized trlat the plan tormulallon <br />process .s neMly completed on tour <br />units currently under Investlgatlon- <br />Lo....er GunniSOn Basll'l Unit IStage I), <br />Uinta BaSin Un1\ (Stage 1l McElmo <br />Creek Un I!. ana Palo Verde Irngatlon <br />Dlstr'Cl Unll ConseQuen11y. the Forum <br />requested R~lamatlon to prepare <br />reports on the lour prOjects presenllng <br />the status and Ihe estimated construC- <br />tiOn costs olthe tentatl~e plans Dratts Of <br />these repQfts h8\e been levlewed and <br />afe CUffently bell'lg completed <br />The lo.....er Gunnison Unll Stalus <br />Report addressed lhe Uncompal'1gre <br />Valley portion 01 the lower Gunnison <br /> <br />O......,d ....bb. """.'d ~.~ ("01_ ...d d~ <br />t~",,~ <br /> <br />BaSin The balance 01 the baSin would be <br />stud lea later The recommended plan <br />calls for hnll'lg about 254 mIles 01 canals <br />and !aterals whiCh would reduce the <br />salmlty at Impenal Dam abOut 122 <br />mgl Based on January 1981 pnces. <br />total construchOn costs are estimated at <br />51367 million ThiS results m a cost- <br />ellectlveness 01 about $846,000 for each <br />mg l 01 salinity reduction at Imperial <br />Dam <br />The tentatIve plan descnbed In the <br />UlI'lta Basin Ul'l1t SlatuS ReOOr1 mvolves <br />selectIVely Itnmg those portions of the <br />canal and lateral distribution syslem <br />whiCh are mailll'lg Ihe largest con- <br />trlbullOnS to Ihe salinity levels II'l the <br />area Reclamation IS workmg closely <br />With SCS II'l developing a coordll'lated <br />program In thiS area The plan currently <br />calls lor lining about 204 miles Of canals <br />and laterals. which would reduce the <br />salinity at Imperial Dam by about 67 <br />mgl The most cost-ellectlve Im- <br />pro~ements will be Identified as the <br />stua.es progress Total construction <br />COSIS are estimated at 5888 million. <br />h.a<;eCf on January 1981 prices exclUSIVe <br />01 the wildlife plan ThiS resulls In a cost- <br />ef1ectlveness 01 about 51.092.000 lor <br />each mg L 01 salinity reduction at <br />Imperial Dam Salinity control ellorts are <br />oomg ClOSely coord mated with ongOlOg <br />Central Utah PrOlE'ct actiVities under the <br />Ulntah. BonneVille. and Upalco Units <br />The McElmo Creek Unit Status Report <br />outhnes three COnceplual plans In- <br />volv,ng canal and lateral lining In com- <br />bmatlon wllh onfarm ImprOvements An <br />additional alternative under study IS the <br />saline water collection, storage. <br />lransportatlon. and reuse component <br />invOlVing transportll'lg saline ....aters to <br />ItIe Four Corners Area lor power plant <br />use The tOlal construct'on costs oltne <br />canallll1lng (Stage I) portion Ise~pected <br />to be apprO~lmately 553 million With a <br />sal,nlly reduCllon 01 about 53 mg 'L at <br />lmpeftal Dam Linked With the SCS <br />onlarm program, McElmo Creek Unit <br />could result In a 10taJ reduction of 10 <br />mg L WI!t'I an overall cost-etlect!veness <br />01 apprO~lmalely S490.000 per mg l <br />The saline ....ater collectIon, storage. and <br />transportation component is e~pe.cted <br />to cost aDQut $67 million With a sallOity <br />reduction 01 about 6 mgl at Impeflal <br />Dam and a cosl-elleCtlveness ot about <br />
The URL can be used to link to this page
Your browser does not support the video tag.