My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11238
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11238
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:16:39 PM
Creation date
10/12/2006 4:50:26 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.10.C.4
Description
UCRBRIP Flooded Bottom Lands
Basin
Colorado Mainstem
Date
1/1/1996
Author
UCRBRIP
Title
Floodplain Habitat Restoration - 1996 Work Plan
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />O~ <br /> <br />4. Monitor physical, chemical, biological conditions weekly (see <br />previous list of data types to be collected) (May-July or <br />August 1996). <br /> <br />5. Drain Old Charlie and harvest all fishes (July or August 1996). <br /> <br />6. Analyze and evaluate results; write report (October-December <br />1996) . <br /> <br />IX. FY 96 Work <br /> <br />3/01/96 <br /> <br />2/22/96 <br />2/22/96 <br /> <br />-Description of work <br /> <br />Tasks 1-5. See above. <br /> <br />-Deliverables (due date) <br /> <br />Draft Report - November 30, 1996. <br /> <br />-Budget <br /> <br />Labor-permanent <br />Labor-seasonal <br />Travel <br />Supplies <br />Contracts <br />Repair/maintenance <br />Sample gear <br /> <br />$ 31,500 <br />$ 17 ,325 <br />$ 3,255 <br />$ 4,200 <br />$ 4,515 <br />$ 13, 540 <br />$ 7,000 <br /> <br />$ Bl,335 <br /> <br />Total <br /> <br />IX. FY 97 Work <br /> <br />3/01/96 <br />3/01/96 <br /> <br />-Description of work <br /> <br />Develop a final report on the hypotheses that were tested <br />during the initial phases of restoration and management. <br /> <br />Additional applications will be identified and implemented in <br />FY 97. <br /> <br />-Deliverables (due date) <br /> <br />Draft Report November 30, 1996 <br />Final Report - March 1, 1997 <br /> <br />-Budget <br /> <br />$5,000 for report writing. <br /> <br />Costs for additional applications to be determined. <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.