My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11227
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11227
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:16:37 PM
Creation date
10/12/2006 4:49:18 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.50
Description
CRSP - Power Operations
Basin
Colorado Mainstem
Date
1/1/1993
Author
CWCB
Title
Background on CRSP Power Operations
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />contract unit over a period of not more than fifty years exclusive of <br />any development period authorized by law; (b) prior to construction of <br />irrigation distribution facilities, repayment contracts shall be made <br />with an "organization" as defined in paragraph 2 (g) of the Reclamation <br />Project Act of 1939 (53 Stat. 1187)11 which has the capacity to levy <br />assessments upon all taxable real property located within its boundaries <br />to assist in making repayments, except where a substantial proportion <br />of the lands to be served are owned by the United States; (c) contracts <br />relating to municipal water supply may be made without regard to the <br />limitations of the last sentence of section 9 (c) of the Reclamation ' <br />Project Act of 1939;11 and (d), as to Indian lands within, under or served <br />by any participating project. payment of construction costs within the <br />capability of the land to repay shall be subject to the Act of July 1, <br />1932 (47 Stat. 564).21: Provided further, <br /> <br />. <br /> <br />.. That for a period of ten years from the date of enactment of this <br />Act ,&1 no water from any participating project authorized by this Actll <br />shall be delivered to any water user for the production on newly irrigated <br />lands of any basic agricultural commodity, as defined in the Agricultural <br />Act of 1949, .or any amendment thereof, if the total supply of such com- <br />modity tor the marketing year in which the bulk of the crop would normally <br />be marketed is in excess of the normal supply as defined in section 301 (b) <br />(10) of the Agricultural Adjustment Act of 1938, as ainended,Y unless the <br />Secretary of Agriculture calls for an increase in production of such com- <br />modity in the interest of national security, All units and participating <br />projects shall be subject to the apportionments of the use of water between <br />the Upper and .Lower Basins of the Colorado River and among the States of <br />the Upper Basin fixed in the Colorado River Compact, and the Upper Colo- <br />rado River Basin Compact, respectively, and to the terms of the treaty <br />with the United Mexican States (Treaty Series 994). <br /> <br />l!i)(l})'TI'!E:$ <br /> <br />This section is codified as 43 U. S. C. A. 620c with the following changes <br />being made in the Annotated Code: <br /> <br />1. "(T)his Act" reads "this chapter." <br /> <br />2. "(S)ection 1 of this Act" reads "section 620 of this title." <br /> <br />3. " (P) aragra ph 2 (g) of the Reclamation Proj ect Act of 1939 <br />(53 Stat. 1187)" reads" section 485a (g) of this title." <br /> <br />4. "(S)ection 9(c) of the Reclamation Project Act of 1939" <br />reads "section 485h of this title. " <br /> <br />. <br /> <br />-336- <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.