My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11227
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11227
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:16:37 PM
Creation date
10/12/2006 4:49:18 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.50
Description
CRSP - Power Operations
Basin
Colorado Mainstem
Date
1/1/1993
Author
CWCB
Title
Background on CRSP Power Operations
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />ts <br /> <br /> <br />ml<Ol'lI'm:s <br /> <br />This section is codified as 43 U.S.C.A. 620a. <br /> <br />1. P. L. 87-483 amended this section by removing San Juan- <br />Chama and Navajo Indian projects from the section. See page 371 <br />for text. <br /> <br />2. P. L. 88-568 did the same for Savery-Pot Hook, Bostwick <br />Park, and Fruitland Mesa Projects, see page 381 for text. <br /> <br />SEC. 3. It is not the intention of Congress, in authori?:ing only <br />those projects designated in section 1 of this Act,V and in authorizing <br />priority in planning only those additional projects designated in section 2 <br />of this Act,Y to limit, restrict, or otherwise interfere with such compre- <br />hensive development as will provide for the consumptive use by States of <br />the Upper Colorado River Basin of waters, the use of which is apportioned <br />to the Upper Colorado River Basin by the Colorado River Compact and to <br />each State thereof by the Upper Colorado River Basin Compact, nor to <br />preclude consideration and authorization by the Congress of additional <br />projects under the allocations in the compacts as additional needs are <br />indicated. It is the intention of Congress that no dam or reservoir con- <br />structed under the authorization of this ActY shall be within any <br />national park or monument. <br /> <br />Jl:lT<Ol'ITIE$ <br /> <br />This section is codified as 43 U. S. C .A. 620b with these changes: <br /> <br />1. "(S)ection 1 of this Act" reads "section 620 of this title." <br /> <br />2. " (S) ection 2 of this Act" reads "section 6 20a of this title." <br /> <br />3. "(T)his Act" reads "this chapter." <br /> <br />SEC. 4. Except as otherwise provided in this Act,Y in construct~n9. <br />operating, and maintaining the units of the Colorado River storage project <br />and the parti<;:ipating projects listed in section 1 of this Act,Y the SeCretilry <br />shall be governed by the Federal reclamation laws (Act of June p, 190~. <br />32 Stat. 388, and Acts amendatory thereof or supplementary thereto): <br />Provided, <br /> <br />That (a) irrigation repayment contracts shall be entered into which. <br />except as otherwise provided for the Paonia and Eden projects, provide f9r <br />repayment of the obligation assumed thereunder with respect to any project <br /> <br />-335- <br />
The URL can be used to link to this page
Your browser does not support the video tag.