Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />003953 <br /> <br />a. It is doubtful that a water quality permit from <br />the Colorado Water Quality Control Commission will be <br />required inasmuch as the water for hydroelecteric pur- <br /> <br />poses will be diverted from a man-made canal and the <br /> <br />generation of electricity will be non-consumptive and <br />non-polluting. <br /> <br />I <br />I I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />b. As noted, by statute, no Colorado permit for <br />diversion is required. <br /> <br />c. Applicant is in the process of performing its own <br />surveys in order that applications for determination of <br />water rights for the hydroelectric aspects of the pro- <br />ject may be completed and filed. Copies thereof will be <br />available, if requested, and when Rulings thereon are <br />obtained, copies will be furnished to the Federal <br />Energy Regulatory Commission. <br /> <br />Applicant is advised there are presently in existence a <br />decree or decrees for the Uncompahgre Federal Reclama- <br />tion Project, but the extent thereof is presently <br />unknown. The primary purpose of the Uncompahgre <br />Project is irrigation, and this applicant will not, in <br />any way, interfere with that primary purpose. <br /> <br />-4- <br />