My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11214
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11214
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:16:33 PM
Creation date
10/12/2006 4:48:45 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.776
Description
Uncompahgre River General
State
CO
Basin
Gunnison
Water Division
4
Date
1/1/1983
Author
West Slope Hydro Par
Title
Before the United States of America Federal Energy Regulatory Commission - Application for License for Major Project - Uncompahgre Valley Hydroelectric Project Number 2
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />JJ~OI8 <br /> <br />I <br />I <br />II <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />addition, the M&D Canal is located west of the Uncompahgre <br />Riv~ in the mesa-type soils. As discussed previously, <br />these mesa soils are not as critical to the salt loading <br />problem as are the adobe soils east of the river. <br />D. ImDacts Qll Recreational Resources <br />If all five proposed projects along the South Canal are <br />licensed and constructed, as a part of the projects, the <br />applicant proposes to upgrade the existing road adjacent to <br />the canal to improve vehicle access and recreational use. <br />Although final plans have not yet been developed, the appli- <br />cant proposes to improve the existing road by grading and <br />gravel surfacing as required, while retaining tbe same <br />general alignment. A hiker/biker trail could be included <br />adjacent to the road. Parking areas or overlooks could be <br />included at each hydroelectric site and at locations with an <br />extraordinary view of the surrounding landscape. Although <br />access to the powerhouses will be restricted fQr safety and <br /> <br />security reasons, arrangements could be made for scheduled <br /> <br />tours, and display boards illustrating the projects could be <br />erected at the sites. <br /> <br />The project boundary (Exhibit G) for Project No. 5 on the <br />Soutt Canal includes the entire road adjacent to canal for <br />the proposed recreational features. As mentioned above, if <br /> <br />E-32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.