Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />000988 <br /> <br />The Uncompahgre Project is one of the oldest Federal reclama- <br /> <br /> <br />tion p~jects constructed between 1904 and 1912 with rehabili- <br /> <br /> <br />tation and additional construction completed in 1937. The <br /> <br /> <br />project facilities divert water from the Gunnison and Uncompah- <br /> <br /> <br />gre Rivers for irrigation of approximately 86,000 acres of <br /> <br /> <br />land. The Gunnison River water is diverted just upstream of <br /> <br /> <br />the Black Canyon of the Gunnison National Monument and <br /> <br /> <br />delivered to the South Canal in the Uncompahgre Valley through <br /> <br /> <br />the 5.8 mile long Gunnison Tunnel. Extending southwesterly for <br /> <br /> <br />11.4 miles from the end of the tunnel to the Uncompahgre River, <br /> <br /> <br />the South Canal has a capacity of approximately 1000 cfs, is <br /> <br /> <br />partially concrete-lined, and includes five short tunnels along <br /> <br /> <br />its length. From the terminal drop of the South Canal at the <br /> <br /> <br />Uncompahgre River, a flume conveys water across the river to <br /> <br /> <br />the West Canal. The West Canal has an initial capacity of 175 <br /> <br /> <br />cfs and is about 21.4 miles long. 1 <br /> <br />Uncompahgre Valley Hydroelectric Project Nos. 1-5, as proposed <br /> <br /> <br />in this and associated FERC lioense applications, are located <br /> <br /> <br />along the South Canal. The sixth project (Uncompahgre Valley <br /> <br /> <br />Hydroelectric Project No.6) is looated at Shavano Falls on the <br /> <br /> <br />Montrose and Delta Canal (M&D Canal). The M&D Canal is <br /> <br /> <br />diverted from the Unoompahgre River approximately 2 miles <br /> <br /> <br />downstream or north of its confluence with the South Canal. <br /> <br />E-2 <br />