My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11204
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11204
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:16:31 PM
Creation date
10/12/2006 4:48:32 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.300.03
Description
San Juan River - Recovery Implementation Program - General Info
Basin
San Juan/Dolores
Water Division
7
Date
6/24/1991
Title
Review of Revised Sections of Recovery Implementation Program
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />D.t"'>. K~ FT <br />,l"{U}t, '" <br /> <br />P: <br />~:J <br />-) biologist familiar with Colorado River fishes to participate in technical <br />~~ research and recovery activities for the San Juan River. <br />Q <br /> <br />4.4 PROCEDURES AND APPROVALS <br /> <br />Implementation of recovery elements would follow the general process outlined <br />below: <br /> <br />A. Long range plan <br /> <br />(1) The program coordinator will develop the original 7-year plan and <br />priorities for the six recovery clements <br /> <br />(2) The plan will be reviewed by the Biology Committee and modified as <br />appropriate <br /> <br />(3) The plan will be sent to the Oversight Committee for review and <br />approva 1 <br /> <br />(4) Long range plan wi1l be updated annua11y through process described <br />above <br /> <br />B. Annual Work Plan <br /> <br />(1) The program coordinator will identify individual projects that are <br />needed to accomplish the 7-year plan for each of the six recovery <br />elements <br /> <br />(2) <br /> <br />The program coordinator will draft an <br />of high priority individual projects. <br />reflect available funding. <br /> <br />annual work plan consisting <br />The annual program will <br /> <br />(3) The plan will be reviewed by the Biology Committee and modified as <br />appropriate <br /> <br />37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.