My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11189
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11189
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:16:28 PM
Creation date
10/12/2006 4:47:31 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8443.600
Description
Narrows Unit - Studies
State
CO
Basin
South Platte
Water Division
1
Date
5/1/1982
Author
DoI BoR
Title
Narrows Unit Colorado No.1
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />w <br /> <br />Status <br /> <br />Preconstruction work recently resumed on the <br />Narrows Unit, funded by the Administration and <br />Congress and supported by the Governor of <br />Colorado and the Colorado General Assembly. <br /> <br />Congress recently approved a transfer of $500,000 <br />in this year's Reclamation budget so that <br />preconstruction worlj: could get underway, The <br />President also recommended an. additional <br />$500,000 to fund work in fiscal year 1983. <br /> <br />In July 1981, the Colorauo General Assembly <br />authorized the newly formed Water Resource and <br />Power Development Authority to pledge some $25 <br />million in State funding for construction of the <br />Narrows Unit in northeastern Colorado, and the <br />Animas,LaPlata Project on Colorado's West <br />Slope. Furthermore, the Governor included funds <br />in his 5-year capital improvements program equal <br />to about 10 percent of these p~ojects' costs. <br /> <br />Preconstruction activities will be conducted dur, <br />ing the remainder of fiscal year 1982 and fiscal <br />year 1983 to review and update information <br />required to ready the project for construction, <br /> <br />. <br /> <br /> <br />-Geologic mapping in the damsite area is being <br />conducted and holes are being drilled to provide <br />additional information to designers concerning <br />geologic materials below the damsite. Some 140 <br />holes have been drilled since the project's incep, <br />tion in 1943. Test pits are also being dug to <br />determine suitability of material available. <br /> <br />-A review of hydroiogic data, including <br />streamflow and water use and demand informa, <br />tion, is being conducted. <br /> <br />-Much of the above information will be used in <br />the review of the dam design and in updating the <br />project's estimated cost. Activities necessary to. <br />ready the project for construction will be com, <br />pleted by summer 1983. <br /> <br />-The final environmental statement, published <br />in 1976, will be reviewed during 1982. Consultation <br />with the Fish ,and Wildlife Service concerning <br />compliance with Endangered Species Act .re- <br />quirements will resume. <br /> <br />-Consultation ,with local, State, Federal, and <br />private entities will c;ontinue. <br /> <br />JULESBURG <br /> <br /> <br />:N" <br /> <br />Irrigable Land <br /> <br />Line indicates approximate location of Narrows Dam. <br />
The URL can be used to link to this page
Your browser does not support the video tag.