<br />projeGt with conditions of waterlogging. Installation of
<br />the wells began in 1959 and by February 1963 a total of
<br />67 drainage wells had been installed." Additional wells
<br />are now under construction to bring the total to over
<br />90 such wells. In the beginning these wells discharged
<br />into the nearest points in the Gila River. Later in 1961,
<br />a conveyance channel more than 50 miles in length and of
<br />about 300 cubic feet per second capacity was completed
<br />to carry the discharge into the Gila River at a point out-
<br />side the Gila Project area.
<br />
<br />No notice concerning the drainage program was given
<br />by the United States to the Government of Mexico.
<br />Additionally, water of such a sustained degree of salinity
<br />had never been delivered to Mexico.4 In November 1961
<br />
<br />o
<br />w
<br />l\)
<br />o
<br />
<br />.
<br />
<br />2
<br />
<br />3.37
<br />3.21
<br />2.82
<br />2.37
<br />3.35
<br />1.79
<br />1.79
<br />2.43
<br />2.01
<br />1.73
<br />
<br />
<br />8 Special Studies, Delivery of Water to Mexico, U. S. Department of the
<br />Interior, Bureau of Reclamation, ii (Feb. 1963).
<br />
<br />4 According to a recent study tho salinity level o~ water delivered to Mexico
<br />at Moreloa Dam for the period October 1961 through July 1962 WltS tho
<br />following:
<br />
<br />Flow
<br />
<br />.
<br />
<br />(average dB)
<br />
<br />964
<br />962
<br />1,329
<br />2,615
<br />. 1,216
<br />3,335
<br />3,387
<br />2,038
<br />2,586
<br />3,216
<br />
<br />Average total
<br />disoolved solids
<br />(tons per
<br />(ppm) acre-foot)
<br />
<br />2,480
<br />2,360
<br />2,070
<br />1,740
<br />2,460
<br />1,300
<br />1,310
<br />1,790
<br />1,470
<br />1,270
<br />
<br />_, .__ ,_., _,..~.._.~_ _.-.,,~_,,~.._~_,_,.~_~,_ "" ,-",~-"-,,,,,,,,^,,,-,,,...~,,~.,,, '""~,-~,,,.,. ;,.....,..,.'"""',."".-?!"~'~'""..,,.,...."""~.,,'c~-,.,,.,.....-'"'7'".....,,-.,..,..--~-,-~-"!'~C~i~
<br />
<br />Oc.tober 1961
<br />November
<br />December
<br />J'anuary 1962
<br />February
<br />March
<br />April
<br />May
<br />Juno
<br />July
<br />Supra note 1, at 21.
<br />
<br />Tho galliO study indicates that for tho period October 1961 through Feb-
<br />ruary 1962, Wenton-Mohawk draina.ge contributed 80,510 acre.feet or 18.9%
<br />of the total of 426,580 ,acre-feet of water delivered during that period to
<br />Mexico at Morelos Dam. This contribution, however, amounted to over 54%
<br />of the ?>tal salt load of such waters delivered to Mexico during this period.
<br />Supra noto 1, at 22.
<br />
<br />/
<br />
|