My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11018
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP11018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:15:41 PM
Creation date
10/12/2006 4:39:40 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8443.600
Description
Narrows Unit - Studies
State
CO
Basin
South Platte
Water Division
1
Date
8/31/1964
Author
Woodward-Clyde-Shera
Title
Compritive cost Estimates for Earth Dams at the Lower Weld County and Narrows Alternative Damsites
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br /> <br />SCOPE <br /> <br />This report presents results of comparative cost estimates <br /> <br />for an earth dam at two alternative sites; (1) the Lower Weld <br />County site near Hardin, Colorado, and (2) the Narrows site near <br />Fort Morgan, Colorado. In our Report No. 7547-7354 dated March 11, <br />1964, covering engineering and geologic investigations at the Lower <br /> <br />Weld County site, our opinion was given that from the engineering <br /> <br />and geologic viewpoint, the Weld County site is superior to the <br /> <br />Narrows site, It was recommended that the Bureau make comparative <br /> <br />cost estimates of construction at these two sites. The U.S,B.R, <br /> <br />has completed the estimates for both sites, and we have reviewed <br />the design and estimates. <br /> <br />The basic conclusions resulting from our review are listed <br /> <br />briefly below followed by a discussion of criteria and assumptions <br />for the estimates made by our firm. <br /> <br />SUMMARY OF CONCLUSIONS <br /> <br />(1) The total yardage of compacted materials required for tbe <br />dam and foundation at the Narrows site is 7,400,000 cubic <br />yards while that required at the Lower Weld County site is <br />17,600,000 cubic yards, Both of these are based on the <br />assumption that the crest elevations presently planned and <br />furnished us are correct, i.e.; elevation 4610 for the <br />Lower Weld County site and elevation 4448 for the Narrows <br />site. <br /> <br />(2) In our opinion, the cost of the dam proper at the Lower Weld <br />County site will be approximately $11,000,000 higher (field <br />cost basis) than tbe dam at the Narrows site. The influence <br />of the dam cost on tbe cost of the overall project utilizing <br />U,S.B.R. figures and including U,S,B,R. indirect costs is <br />shown in Table I attached. <br /> <br />DISCUSSION <br /> <br />Data Furnished by U,S,B.R, <br />FollOWing is a list of U.S,B,R. data utilized for tbe estimates <br /> <br />made by our firm: <br /> <br />WOO[l'oVAfW,CtYO[_SlllR^"r; AND ^~!;OU^Tf5 __ <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.