My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10987
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:15:32 PM
Creation date
10/12/2006 4:38:57 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.60
Description
CRSP
Basin
Colorado Mainstem
Date
5/21/1958
Author
US Congress
Title
Financial and Economic Analysis - Colorado River Storage Project and Participating Projects
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />32 <br /> <br />COLORADO RIVER STORAGE PROJECT <br /> <br />PROJECT REPAYMENT <br /> <br />A repayment ~nalysis of the Colorado River storage project and <br />participating projects has been made to demonstrate how repayment <br />of I:eimbursable gonstruction costs of ,the p,:oject, including ~nterest <br />durmg constructIon, can be accomphshed m a.ccordance wIth the <br />provisions of the i authorizing legislation. Costs alloeated to recrea- <br />tion and to fish aild wildlife are made nonreimbursable by the author- <br />izing act. Costs !allocated to flood control are also nonreimbursable. <br />Costs allocated to irrigation, power, and municipal and industrial <br />water nse, which. represent more than 99 percent of tho project cost <br />after de<\uctions are made for contribute(\ funds and nonreimbursable <br />investigation expenditures, are reimbnrsable. <br />Reimbursable qosts except as noted below will be repaid in a period <br />of not more than 50 years from the date of completion of the respective <br />storage units, pdrticipltting projeets, or seJlal'llble features thereof, <br />following in the base of irrigation a snitable development period of <br />not more than ld years. Irrigation-water users will repay in accord- <br />ance with their estimated ability for a period of 50 years except as <br />otherwise providM by separate authorization acts for the Eden and <br />Paonia projects. . Project repaymont contracts will be executed with <br />conservancy-typo districts which have the capacity to levy assess- <br />ments upon all taxable real property located witbin thoir boundaries <br />to assist in paying project costs. 'Municipal and industrial water <br />users will repay \Vith intercst at 2% percent the full cost allocated to <br />municipal and inHustrial water. Power will be sold at rates at which <br />all costs allocated t.o power will be repaid with interest at 2l' percent <br />and revenues will be pI'ovided to assist in the repayment of irrigation <br />costs. : <br />~PPER COLORADO RIVER DASIN FUND <br /> <br />All revenUes cdllectod in the opemtion of the Colomdo River storage <br />project and participating projects will be. credited to and disburaed <br />from the Upper C)olorado River Basin fund as provided by the project <br />authorizing act. i Accounting records for tbe basin fund will be main- <br />taine(l to ahow (1) source of revenue and (2) the applieation of total <br />revenues receive(! into the fund. Surplus revenues in the basin fnnd, <br />as defined in section 5 (e) of the act of April 11, 1956, will be used <br />to repay irrigat~on costs of participating projects that are beyond <br />the repayment ~bility of the project irrigators. Surplus revenues <br />remaining in the basin fund from participating projects will be ap- <br />portioned to the! State in which such participating project is located <br />and surplna rev~nues from the storage units will be apportioned by <br />States aa ahown below. <br /> <br />P~rcmt . Percent <br />COlorado_________L____h_____ 46.0. Wyoming____________________ 15.5 <br />Utah____________~----------- 21. 5 New Mexioo__________________ 17.0. <br />In accordanc~ with the foregoing procedures, disbursements from <br />the basin fund for the storage l'roject or for participating projects <br />will be made gerierally in the fol owmg order: <br />(1) Payment of opemtion, maintenance, replacement, and <br />emergency 90sts for project facilities. <br />
The URL can be used to link to this page
Your browser does not support the video tag.