My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10967
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10967
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:15:28 PM
Creation date
10/12/2006 4:38:22 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.765
Description
Little Snake River General
State
CO
Basin
Yampa/White
Water Division
6
Date
6/1/1989
Author
DOI-BLM
Title
Little Snake Resource Management Plan and Record of Decision
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />ODe5!)l <br /> <br />Support <br /> <br />Engineering, surface reclamation, and archaeologic <br />support will be required in the design and construction of <br />projeclS. Other resource specialislS will assess impaclS of <br />proposed projects and identify mitigative measures, if needed. <br />Cadastral survey will locate public land boundaries. <br /> <br />Forest Lands and Woodlands <br /> <br />Objectives <br /> <br />Manage the suitable pinyon-juniper woodlands and <br />commercial forest lands to maintain stand productivity and <br />to help meet fuel wood and saw timber demand on a <br />sustained-yield basis. <br /> <br />Planned Actions <br /> <br />I. Existing IO-year forest management plans will continue <br />for Diamond Peak/Middle Mountain and Douglas <br />Mountain. <br /> <br />2. Commercial fores' lands (6,330 acres) will be managed <br />to produce a variety of forest produclS on a sustained <br />yield basis. Limited management (such as natural <br />revegetation and minimal cultural treatmenlS) will <br />apply to remaining commercial forest lands. Allowable <br />harvest levels under a sustained yield have been <br />calculated at 300,000 board feet per year. The allowable <br />harvest will be recalculated periodically based on <br />updated inventories. <br /> <br />3. Approximately 37,600 acres of woodland will be <br />managed to produce a variety of woodland products <br />on a sustained-yield basis. Limited management will <br />apply to the remaining woodland acreage. Annual <br />allowable woodland harvest levels under a sustained <br />yield have been calculated at 2,500 cords, or 1.25 <br />million board feet per year. The allowable harvest will <br />be recalculated periodically based on updated <br />inventories. <br /> <br />4. Access will be acquired for future timber sales (see Map <br />2). <br /> <br />5. Public harvest areas will be opened to meet local <br />demand. <br /> <br />Resource Condition and Rationale <br /> <br />Advertised and negotiated sales of forest products will <br />continue to meet local and regional demand for both <br />commercial and individual harvest. This type of management <br /> <br />RESOURCE MANAGEMENT DECISIONS <br /> <br />will allow harvesting of timber products while ensuring their <br />perpetuity within the principles of multiple-use management. <br /> <br />Implementation Priorities <br /> <br />None identified. <br /> <br />Monitoring <br /> <br />Monitoring of specific surface-<listurbing activities will <br />occur on a case-by<ase basis to ensure adherence to pertinent <br />stipulations/mitigations. <br /> <br />Support <br /> <br />Engineering, surface reclamation, hydrologic, soils, and <br />archacologic support will be required in the design and <br />construction of projeclS. Other resource specialislS will assess <br />impaclS of proposed projeclS and identify mitigative <br />measures, if needed. Fire management support will be needed <br />for managing natural fire and prescribed burns. Cadastral <br />survey will locate public land boundaries. <br /> <br />Fire Management <br /> <br />Objectives <br /> <br />In full suppression zones tbe objectives are: <br /> <br />. Give first priority to personal safety, life, or property. <br /> <br />. Prevent wildfire from causing any tree mortality in current <br />and plop05ed commercial timber sale and woodland <br />product contract areas. <br /> <br />. Prevent wildfire from destroying any perishable <br />designated cultural resource sites. <br /> <br />. Prevent wildfires from destroying areas with significant <br />riparian values. <br /> <br />In conditional suppression zones, where conditions may <br />not warrant the higbest level of fire suppression, tbe objectives <br />are: <br /> <br />. Suppress all wildfires by taking appropriate suppression <br />action. Appropriate actions will be based upon <br />preplanned analysis consistent with land management <br />objectives including the threat of life and property, <br />economic evaluations, and resource constraints. <br /> <br />. Use suppression strategies wbicb do not require <br />unnecessary exposure of firefighters and equipment to <br />threatening situations. <br /> <br />19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.