My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10966
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10966
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:15:28 PM
Creation date
10/12/2006 4:38:21 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8449.900
Description
Bear Creek
State
CO
Basin
South Platte
Date
10/10/1986
Author
Evergreen Metro Dist
Title
Preliminary Plan of Operation for Evergreen Metropolitan District - Bear Creek Reservoir
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br /> <br />. <br /> <br />. <br /> <br />Table 2 also contains the average monthly evaporation losses <br /> <br />I <br /> <br />developed in Table 1 to be supplied by E.M.D. <br /> <br />When compared to <br /> <br />the estimated consumptive use for the five shares of Pioneer <br /> <br />I <br /> <br />Union Dit~h, it is seen that the consumptive use attributed to <br /> <br />five shares is greater than the estimated evaporation loss. <br /> <br />I <br /> <br />Table 2 shows that there is a net excess of consumptive use <br /> <br />I <br /> <br />attributed to the five shares of Pioneer Union Ditch over the <br /> <br />lake evaporation of 18.3 acre-feet. <br /> <br />It is proposed that this <br /> <br />I <br /> <br />18.3 acre-feet be stored annually in the 130 acre-feet of storage \~(~ <br />'!p ~ 1. ~ <br />~? <br /> <br />As an average, the excess 18.3 acre-feet of consumptive use <br /> <br />space requested by E.M.D. <br /> <br />I <br /> <br />I <br /> <br />of the five shares would fill the storage allocation of 130 <br /> <br />acre- <br /> <br />feet in approximately seven years. <br /> <br />The E.M.O. plans to use <br /> <br />the <br /> <br />I <br /> <br />water stored in Bear Creek Reservoir to make up senior calls by <br /> <br />the McBroom Ditch located about 1.5 miles upstream of the mouth <br /> <br />I <br /> <br />of Bear Creek. <br /> <br />These calls are expected to occur no more fre- <br /> <br />I <br /> <br />quently than about once every nine years. <br /> <br />The E.M.D. plans to <br /> <br />release from the reservoir for the duration of the calls. <br /> <br />It is <br /> <br />I <br /> <br />estimated that the magnitude of the required release will range <br /> <br />between 0.1 c.f.s. and 5.0 c.f.s. <br /> <br />I <br /> <br />I <br /> <br />I <br />I <br /> <br />I <br />I <br /> <br />-5- <br />
The URL can be used to link to this page
Your browser does not support the video tag.