My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10956
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10956
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:15:24 PM
Creation date
10/12/2006 4:37:31 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.470
Description
Pacific Southwest Interagency Committee
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
8/1/1963
Author
PSIAC
Title
Pacific Southwest Water Plan - Appendix - August 1963
Water Supply Pro - Doc Type
Report/Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
301
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />7 <br /> <br /> <br />002239 <br /> <br />The estimated total capital cost for this prospective plan, <br />including storage reservoir systems, incremental conveyance <br />through the East Side Division and thence to southern California, <br />is $975,000,000 (reconnaissance). The net annual OM&R and pump- <br />ing costs are $18,400,000. <br /> <br />. <br /> <br />Under this proposal the 1,200,000 acre-feet of additional <br />water would be stored and conveyed to southern California at an <br />estimated average annual equivalent cost of $52 per acre-foot, <br />including interest at 3 percent and amortization of the facilities <br />in 50 years. The average annual acre-foot cost given is computed <br />by using only the incremental costs of enlargement of conveyance <br />facilities. Appropriate allocation of costs between the East Side <br />Division facilities and the proposed incremental enlargement under <br />this plan may reflect some increase in this acre-foot value. <br /> <br />Associated with this development would be the East Side Divi- <br />sion which would provide 1,500,000 acre-feet of service to that <br />area with its resulting multiple-purpose benefits. The estimated <br />capital cost of the proposed facilities required for East Side <br />Division is about $600,000,000, exclusive of distribution systems. <br />The East Side Division is proposed for authorization, construction, <br />and operation, as an integral part of the Central Valley Project. <br />In order to accomplish the conveyance of the additional 1,200,000 <br />acre-feet to southern California, concurrent authorization of the <br />facilities would be required. <br /> <br />The reservoir storage systems proposed on the Trinity River <br />System under this plan (Helena and Eltapom) and related diversions <br />to Sacramento River should be authorized for construction and <br />operation by the Bureau of Reclamation as part of the Pacific <br />Southwest Water Plan, even though they will be integrated closely <br />with existing and proposed features of the Federal Central Valley <br />Project. <br /> <br />. <br /> <br />To other facilities--the Delta Peripheral Canal and the <br />Kellog Unit--also should be associated with this proposed plan for <br />authorization as part of the Central Valley Project, with finan- <br />cial participation by the State and other agencies as appropriate. <br />These facilities will offset, in particular, adverse effects which <br />may occur to water supplies in the Delta area due to further water <br />supply development in the Central Valley Basin and increased diver- <br />sions from the DFlta. The total capital costs of these features <br />are estimated at $125,000,000, with annual OM&R and pumping costs <br />of $1,200,000. <br />
The URL can be used to link to this page
Your browser does not support the video tag.