My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10955
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10955
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:15:24 PM
Creation date
10/12/2006 4:37:30 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8441.400
Description
The Colorado Big Thompson Project - Reports
Basin
South Platte
Water Division
1
Date
1/1/1947
Title
Duplication of Electric Transmission Lines a Waste of Public Funds
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />- .~..\ <br /> <br />.f~ <br /> <br />!"""'. <br />~ <br />CJ~ <br />"..." <br />-, <br /> <br /> <br />necessary to <<onneet the project to the Company's system. The Company is <br />. willing .to build these Hnes, thus pu;rchas!ng the power at the sourjZe ot generation. <br />The,(lost would be approximately $1,000.000 and the projeet would be relieved <br />of this expenditure 0/ taxpayers' money. . <br /> <br />The overlay map ind1~ates in red the tranpmiss!on lines ineorporated in <br />the Bureau request tor funds from Congres.s tor the Colorado-Big Thompson <br />Project for the fiseal year 19413. It i~ ~st from these map.s that the Bureau <br />prop!lses to completely duplV:ate the COIl).pa:ny's system in this area where ample <br />facilities exist. and where anyhture $edswill be p:romptly met by the Company. <br /> <br />The speci1ie plans. tor th~ COlorado-Big Thompson Project were eon- <br />tained in Senate Do.cument No. 8.0 .presented to t~ 75thCQIlgress, 1st Bessiou, <br />and efrt;itled, "Colorado-Big Thomps.on Projeet - SY1l.opsisot ~port on Colorado.. <br />Big 11hompson Projelrt~ Plan.o! Development and Cost EStin).ate Prepared by the <br />BureaU of Redamatiolt, Department of Interisr," These speeifilil'plal'lS werti! <br />approved and $900,000 trtitial eonstrul!:tion tundswere apPropriated in 19S7 by <br />Publi/i Law 249 (75th Congress, 1st Seuio~ 50 Stat, 595) as tsllows: <br /> <br />"Colorado~Big Thompson Proje!!:t~ Colorado: <br />For ~onstruction in aeeordanee with the plan <br />described in Senate DoeuILl.ent nu:mbe~ed 80","; <br /> <br />.and th~rea!ter on May 9>> 1938, (52. stat. 321) Congress appropriated $1.250,flOO <br />provid,ing that "not less than III 600,000 otthe sum appropriated shall be used in <br />the eoftstruetion of Green Mountain Reservoir in a~il:ordanee with the plans set <br />forth in said Senate DOCument No, 80," <br />. , <br /> <br />Senate Document No, 80 limited all transmis.sion lines therein to 192 <br />eireuit, mUes at a eost ot III 2.281, ODD, Fifty"'fourCl'i~uit mUes of this 192 miles. <br />were f<<)r the purpose of. eonne~ting the power generating leatures of the proje~ <br />to the YalILl.ont Plant of the Puhlle Servil!eCompany .ofColorado(therein desig- <br />nated as the market). andtheve~der waS tQl'loMEict tl.w,sey:.ral plants ot the <br />projept, Congress has not. autlj.Qrl,$;.edany,~e ~n tpts Qrig~ plan as tar as <br />transILl.lss!on lines are eoneerned, in the area shown' on t.\1e map. <br />1/ ' <br /> <br />. <br />~ <br /> <br />. In .eom:rast, and to herein emphasize the Bureart's more re,eent tremen- <br />dous expansion and enlargement plans, the Bureart in 1947, in its req1iest for <br />Colorado-Big Thompson Projeqt tunds for the fiscal year 1948, listed and <br />proposed eonstruetion of 784 more mUes 01 transmission lines at an Ltltimate <br /> <br />. <br />. <br /> <br />~ <br />u <br />. <br />;; <br /> <br />g <br /> <br />. <br />. <br />e <br /> <br />,. 7 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.