My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10943
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10943
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2009 11:10:47 PM
Creation date
10/12/2006 4:37:10 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407.500
Description
Platte River Basin-River Basin General Publications-Missouri River General Publications
Date
1/17/1975
Author
MRBC
Title
1975 Water Assessment-Missouri River Basin-Memorandum of Agreement Between the Missouri River Basin Commission and the US Water Resources Council 1
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Phase III, composed of one specific activity -- (1) review of and <br />comment on the National Assessment Report -- will be completed by October <br />1977. <br /> <br />PHASE I <br /> <br />1481 <br /> <br />ACTIVITY ONE - PREIMPLEMENTATION <br />The objective of this activity is to prepare and consumate the <br />memorandum of agreement between the Missouri River Basin Commission and <br />the U.S. Water Resources Council. This activity will be completed when <br />the memorandum of agreement is signed by both parties. <br />PHASE II <br />ACTIVITY ONE - PROBLEM IDENTIFICATION <br />The objective of this activity is to identify, locate on a map. and <br />briefly describe in an initial problem list, the existing and the anticipated <br />future water and related land resource problems within the Missouri Region <br />which can be identified from the existing conditions, the central case <br />projections or actions being implemented or considered for implementation <br />by federal, state and local agencies or private entities. <br />This objective will be attained through accomplishment of the following <br />four subactivities. <br />Subactivity 1 -- Participant Selection <br />During this subactivity all of the participants for the national <br />assessment study will be selected as outlined in the organizational structure <br />(see Figure 2).' The Missouri River Basin Commission will submit a list <br />of the regional participants to WRC. <br />The Missouri River Basin, Commission will serve as the regional sponsor <br />of the national assessment and will be responsible for transmitting technical <br />memoranda and state/regional reports to WRC. The Missouri River Basin <br />Commission has delegated to an Overview Committee the overview responsibility <br /> <br />-3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.