My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10943
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10943
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2009 11:10:47 PM
Creation date
10/12/2006 4:37:10 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407.500
Description
Platte River Basin-River Basin General Publications-Missouri River General Publications
Date
1/17/1975
Author
MRBC
Title
1975 Water Assessment-Missouri River Basin-Memorandum of Agreement Between the Missouri River Basin Commission and the US Water Resources Council 1
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1/17/75 <br /> <br />TABLE 1 -- PARTICIPANTS AND DESIGNATED RESPONSIBILITIES <br /> <br />Acti vity - <br />Subactivity <br /> <br />Participants <br /> <br />Designated Responsibility <br /> <br />PHASE I <br />ACTIVITY ONE -- PREIMPLEMENTATION <br /> <br />MRBC Staff and <br />MRBC <br /> <br />Prepare and Consummate the Memorandum of Agreement. <br /> <br />PHASE II <br />ACTIVITY ONE -- PROBLEM IDENTIFICATION <br /> <br />Subactivity 1 <br /> <br />Parti ci pant <br />Selection <br /> <br />MRBC <br /> <br />Select Group A and Group B participantsl! <br /> <br />r- <br />~ <br />m.~ <br />CD <br /> <br />Subactiv1ty 2 <br /> <br />Develop Initial MRBC Staff <br />Problem and <br />Issues List <br /> <br />Locate, categorize and briefly describe existing and potential <br />future problems by time frame (1975-1985 and 1985-2000) <br />utilizing a regional map and Figures 3 and 4. <br /> <br />Compile the results of subactivity 2 and tentatively select <br />analytical areas which approximate the problem areas. <br /> <br />Review and comment on subactivities 2 and 3 and supplement <br />information in subactivities 2 and 3. <br /> <br />, <br />I <br />I I <br />10 <br /> <br />Define Tentative MRBC Staff <br />Analytical Areas <br /> <br />Subactivity 4 -- Obtain Region- Group B <br />wide Review and <br />Reaction to pro- <br />blems and Issues <br /> <br />Subacti vi ty 3 <br /> <br />MRBC Staff <br /> <br />Synthesize the Group B comments. <br /> <br />Overview <br />Commi ttee <br /> <br />Review and approve the technical memorandum documenting the <br />results of activity one. <br /> <br />Endorse the technical memorandum documenting the results of <br />activity one to be transmitted to WRC. <br /> <br />MRBC <br /> <br />l! A relatively small overview committee of the MRBC has been given the responsibility for the National Assessment on <br />behalf of the MRBC. <br /> <br />-, <br />
The URL can be used to link to this page
Your browser does not support the video tag.