My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10943
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10943
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2009 11:10:47 PM
Creation date
10/12/2006 4:37:10 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407.500
Description
Platte River Basin-River Basin General Publications-Missouri River General Publications
Date
1/17/1975
Author
MRBC
Title
1975 Water Assessment-Missouri River Basin-Memorandum of Agreement Between the Missouri River Basin Commission and the US Water Resources Council 1
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. Needs for research and data collection--recommend programs that <br />should be modified or broadened to meet the future needs. <br /> <br />Needs for changes in the current institutional, financial. <br />legal. and socio-economic water and related arrangements. <br />policies and programs that should be implemented in each time <br />frame (1975-1985 and 1985-2000) to provide an improved base for <br />resolving the problems within the Missouri Region. <br />Role of federal. state, local and private entities--identify <br />and recommend the roles and highlight deviations from the current <br />posture for effective and efficient resolution of the priority <br />problems within the region through implementation, planning, <br />research and data collection. <br />The elements of this subactivity will be evolved by the MRBC staff. <br />Once evolved the Group A participants will be requested to review and perhaps <br />supplement the data and information which will be submitted to the <br />Overview Committee and MRBC for endorsement. <br />Subactivity 18 - Establish Priorities <br />The Overview Committee will establish priorities for Level B studies <br />for each time frame (1975-1985 and 1985-2000). The Overview Committee <br />will then submit its recommended priority listing to the Missouri River <br />Basin Commission for endorsement. <br /> <br />. <br /> <br />. <br /> <br />Subactivity 19 - Prepare the State/Reqional Report <br />During this subactivity, the MRBC staff will prepare a draft of the <br />state/regional report. The Overview Committee will review and provide <br />comments thereon prior to conducting a regionwide review by the Group B <br />participants. <br />An outline of the specific problem analysis report ('the state/regional <br />report) is provided by Appendix B. <br /> <br />-10- <br /> <br />147j <br />
The URL can be used to link to this page
Your browser does not support the video tag.