Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />are made from the storage accounts. Evaporation losses are <br />computed based on the percentage of the total reservoir space <br />allocated to each entity and percentage of water stored in the <br />flood control pool. <br />It is further assumed in the operation study that storaqe <br />space above the permanent pool has no water in it at start uP. <br /> <br />1.2.8 Evaporation Rates <br /> <br /> <br />The Division 1 Water Court approved the following average <br /> <br /> <br />net evaporation rates in Case No. 82CW425, application of the <br /> <br /> <br />City of Morrison for water rights in Bear Creek Reservoir, which <br /> <br /> <br />average evaporation rates will be used for all hydrologic condi- <br /> <br /> <br />tions: <br /> <br />Jan . 2 inches .017 feet <br />Feb .6 .050 <br />Mar 1.5 .125 <br />Apr 2.2 .183 <br />May 3.0 .250 <br />Jun 5.5 .458 <br />Jul 6.0 .500 <br />Aug 5.0 .417 <br />Sep 3.0 .250 <br />Oct 2.0 .167 <br />Nov .6 .050 <br />Dec .4 .033 <br /> 30.0 inches 2.500 feet <br /> <br />1.2.9 Evaporation Loss Make Up <br />Evaporation losses were made up in the manner described <br />below: <br /> <br /> <br />A. Permanent Pool Evaporative Loss Replacement: <br /> <br /> <br />The entities requesting storage accounts in Bear Creek Lake <br /> <br /> <br />are required to provide replacement water for 50 percent of <br /> <br />1-11 <br />