Laserfiche WebLink
<br />, <br /> <br />PRELIMINARY CONSTRUCTION COST ESTIMATE <br />CORTEZ--TOWAOC M & I PIPELINE <br />(19.5 miles of pipeline with two turnouts) <br /> <br />ITEM NO. <br /> <br />1. Excavation <br />2. Pipe: 10-AC-50 <br />3. Pipe: 12-AC-40 <br />4. Pipe: 12-AC-45 <br />5. Pipe: 12-AC-50 <br />6. Pipe: 12-AC-60 <br />7. Pipe: 15-AC-50 <br />8. Pipe: 15-AC-60 <br />9. pipe: 18-AC-40 <br />10. Pipe: 18-AC-45 <br />11. Pipe: 18-AC-50 <br />12. Pipe: 18-AC-60 <br />13. Pipe: 21-AC-45 <br />14. Pipe: 21-AC-50 <br />15. Pipe: 21-AC-60 <br /> <br />QUANTITY <br /> <br />45,690 <br />4,000 <br />1,300 <br />16,700 <br />14,100 <br />7,500 <br />5,800 <br />15,700 <br />600 <br />1,100 <br />8,400 <br />600 <br />2,100 <br />8,700 <br />16,400 <br /> <br />Subtotal <br /> <br />103,000 <br /> <br />Pipe installation <br /> <br />103,000 <br /> <br />UNIT <br /> <br />yd3 <br />1.f. <br />1.f. <br />1.f. <br />1. f. <br />1.f. <br />1. f. <br />1.f. <br />1.f. <br />1.f. <br />1.f. <br />1.f. <br />1. f. <br />1.f. <br />1.f. <br /> <br />1. f. <br /> <br />16. Backfill 26,830 yd3 <br />17. Compacted backfill 12,890 yd3 <br />18. Drain valves 18 ea. <br />19. Air Valves 20 ea. <br />20. Unlisted items (bend, tapers, tees <br />asphalt, repair. Lump sum-l0% of pipe cost) <br /> <br />Subtotal <br /> <br />Contingency (15%) <br /> <br />Total <br /> <br />UNIT <br />PRICE <br /> <br />1.60 <br />5.241 <br />5.58 <br />6.95 <br />7.22 <br />8.91 <br />13.45 <br />16.37 <br />13.20 <br />13.36 <br />15.10 <br />18.63 <br />21.62 <br />22.58 <br />28.01 <br /> <br />AMOUNT <br /> <br />$ 73,104.00 <br />20,960.00 <br />7,254.00 <br />116,065.00 <br />101,802.00 <br />66,825.00 <br />78,010.00 <br />257,009.00 <br />7,920.00 <br />14,696.00 <br />126,840.00 <br />11,178.00 <br />45,402.00 <br />196,446.00 <br />459,364.00 <br /> <br />. <br /> <br />Pipe only $1,582,875.00 <br /> <br />5.00 <br /> <br />1.00 <br />3.10 <br />700.00 <br />900.00 <br /> <br />515,000.00 <br /> <br />26,830.00 <br />39,959.00 <br />12,600.00 <br />18,000.00 <br /> <br />. <br /> <br />154,000.00 <br />$2,349,264.00 <br />352,390.00 <br />$2,701,654.00 <br /> <br />lCost of pipe delivered to Cortez, Colorado. Estimate made November 3, 1982. <br />Quote by Dave Wade at Certan Teed Pipe, Denver, Colorado. <br /> <br />2prices are average for 9 bids on similar Western Slope projects bid in 1981 and <br />1982. <br /> <br />602 cost/est <br />