Laserfiche WebLink
<br />CONSTRUCTION COST ESTIMATE <br />CORTEZ--TOWAOC M & I PIPELINE <br />(19.5 miles of pipeline with two turnouts) <br /> <br />ITEM NO. <br />Engineering, legal special <br />services <br /> <br />QUANTITY UNIT <br />(lump sum) <br /> <br />UNIT <br />PRICE <br /> <br />Waterway Structures <br />Cortez Turnout 18" diameter <br />Towoac Turnout 10" diameter <br />Road Crossings <br />Colo. Highway 145 <br />U. S. Highway 666 <br /> <br />1 <br /> <br />(lump sum) <br />(lump sum) <br /> <br />Subtotal <br /> <br />Contingency (15%) <br /> <br />Total <br /> <br />Land & Right of Way <br />Easement 70' width <br /> <br />58 <br /> <br />AC <br /> <br />1100 <br /> <br />Contingency (15%) <br /> <br />Total <br /> <br />Sununary <br />Land & Right of Way <br />Engineering & Legal <br />Pipeline <br />Misc. <br /> <br />Total <br /> <br />, <br /> <br />AMOUNT <br />600,000.00 <br /> <br />. <br /> <br />15,000.00 <br />8,000.00 <br /> <br />5,000.00 <br />5,000.00 <br /> <br />33,000.00 <br /> <br />4,950.00 <br /> <br />$38,000.00 <br /> <br />63,800.00 <br /> <br />9,800.00 <br />$73,600.00 <br /> <br />. <br /> <br />$ 73,600.00 <br />600,000.00 <br />2,525,264.00 <br />38,000.00 <br /> <br />$3,236,864.00 <br />