Laserfiche WebLink
<br />Table 1. Estimated Construction Costs--:"Mosca-Sargent Area <br /> <br />Wells - capacity 1.0 c.f'.s. - pumps, motors and <br />controls - 36 @ $9,000 per well <br /> <br />Land and rights - easements on 23,000 acres @ $10 <br /> <br />$ 324,000 <br /> 230,000 <br /> 29,500 <br /> 20,500 <br /> 4~6,500 <br /> <br />Substation ~ 69 - 13.8 kv. lump sum <br />13.8 kv. breaker bay <br /> <br />Laterals and conveyance channels - 60 miles lump sum <br /> <br />TranSmission line - 13.8 kv. wood pole, single cross <br />arm. 4 wire-- 40 miles @$4,9QO/mi. <br /> <br />Reclosers - 5 @ $1,200 each <br /> <br />Observation wells .:. 36 @ $50 <br /> <br />Inlets to channels 36 @ ~O each <br /> <br />- Cattle guards 50 @ $500 each <br /> <br />Precast COIicrete pipe lateral. crossing - 1.1. @ $800 each <br /> <br /> <br />Operating and access roadS - 60 miles @ $500/mi. <br /> <br /> <br />Road surf'acing - 60 miles @ $500/mi. <br /> <br /> <br />Transf'orme~s - 10 lwa.. - 36 @ $800 <br /> <br />196,000 <br />6,000 <br />1,800 <br />2,880 <br />25,000 <br />8,800 <br /> <br />Subtotal <br /> <br />30,000 <br />30,000 <br />28.800 <br />$1,359/780 <br />3!to.220 <br />$;1.,100,000 <br />595.000 <br />$2,295,000 <br /> <br />Contingencies 25% + <br />Subtotal. <br /> <br />Engineering, supervision and other costs 35%' :!:. <br /> <br />Total. estimate construction costs <br /> <br />Rev. 1-8-65 <br /> <br />r ~ <br />\... ,-' <br /> <br />r-:- ,-., <br />':;00 <br /> <br />l5 <br />