My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10867
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10867
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:15:02 PM
Creation date
10/12/2006 4:34:40 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8278.400
Description
Title I - Mexican Treaty
Basin
Colorado Mainstem
Date
3/1/1962
Author
IBWC
Title
Mexican Water Treaty -Appendix E -Water Supply
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />" <br /> <br />'.' <br /> <br />"Senator McFARLAND. Right there, !vir. Riter: You mean by recovery <br />of ground water, pumping? <br />"Mr. RITER. Yes, sir. <br />"Senator McFARLAND. That is water that is 12,000 parts per million? <br />"Mr. RITER. Yes, sir. <br />"Senator McFARLAND. And one of the reasons why that acreage <br />has decreased is on account of the quality of the water? <br />"Mr. RITER. Yes, sir. That is the si'lualion. <br />"Senator McFARLAND. Very well. <br />"Mr. RITER. The total area of 160,000 acres, which we assume <br />will be irrigated in the Gila project, will require a diversion of 960,000 <br />acre-feet per year from the Colurado River. Of that 960,000 acre-feet <br />the consumptive use would be 560,000 acre-feet, and the return flow <br />which will enter the Colorado Ri ver will be 400,000 acre--feet. This <br />return flow will very largely initially enter the Gila River and return <br />to the Colorado River through the Gila. <br />"The Gila Ri ver emptIes into the Colorado River near Yuma, and <br />some of the return flow 0.1: ,he Yuma mesa just immediately west of <br />the Yuma project, and whose lands are quite sandy, will percolate <br />down into the Colorado Ri'/er direct, not through the Gila. <br />"The next project to be discussed is the central Arizona project, <br />which is located in the Phoenix basin. <br />"Senator McFARLAND. Before you get to that, how much did you <br />estimate would be return flow from the other projects? <br />"Mr. RITER. 135,000 acre-feet from the Yuma, and 400,000 acre- <br />feet from the Gila. <br />"Senator McFARLAND. That is a total of how much? <br />"Mr. RITER. That is 535,000 acre-feet. <br />"Senator McFARLAND. All right. Now, horn that water you esti- <br />mate that none of 'it can be reused except by pumping it in the All- <br />American CanaP <br />"Mr. RITER, V/ell, I would not restrict it exactly to the All-American <br />CanaL It might be possible that some of it might be pumped into the <br />Yuma project canal. <br />"Senator McFARLAND. That would be a very small amount? <br />"Mr. RITER. It would have to be pumped in any event. <br />"Senator McFARLAND. Of course as you get on down, the possi- <br />bilities for pumping are reduced because you haven't any land left to <br />pump to at the end of the project? <br />"Mr. RITER. Tha'L is right. The Bureau of Reclamation in cooperaUon <br />with the State of Arizona. is now investigating the possibilitles of bringing <br />water from the Colorado River to serve the central Arizona area. There is <br />now irrigated in that area in excess of 500,000 acres of land. These lands <br />are being irrigated from the Gila River and i'ts principal tributaries, the <br />principal tributaries of which are the Sale River and the Verde River. The <br /> <br />-28- <br />
The URL can be used to link to this page
Your browser does not support the video tag.