Laserfiche WebLink
<br />, <br /> <br />..... <br />(,,"') <br />en <br />-J <br /> <br />Legal, fiscal and administration, and <br />interest during construction @ 10% <br /> <br />Total Oct. 1978 <br />estimated cost $ <br /> <br />Total estimated cost <br />adjusted to January <br />1991 dollars using ENR <br />CCI 444,7 $ <br />265.4 <br /> <br />',4 <br /> <br />$ <br /> <br />19,225 <br /> <br />211,477 <br /> <br />354.347 <br /> <br />Filtrationsvstem maintenance costs (based on 20-yr normal annual <br />flow of 91.023 qpm) <br /> <br />Labor and overtime: 2920 hrs/yr @ $35.00jhr <br />Electricity: 157,850 @ $.12/kwh <br /> <br />Maintenance material: 1070 x 444,7 <br />265.4 <br /> <br />Total January 1991 <br />estimated cost <br /> <br />$ <br /> <br />l02,200 <br /> <br />18,942 <br /> <br />.,,; <br /> <br />l,793 <br /> <br />$ <br /> <br />'Ii <br /> <br />122.935 <br /> <br />Estimated costs of a reverse osmosis treatment system is also <br />based on the EPA cost curves and adjusted to a January 1991 base <br />using the ENR CCI, Cost are estimated as follow: <br /> <br />,;] <br /> <br />$ <br /> <br />.:{ <br />'i <br />4 <br />3. <br />I <br />, <br />, <br />, <br />'j <br />Il <br />1 <br />, <br /> <br />Installation of reverse osmosis treatment svstem with 150.000 qpd <br />orocessinq caoacitv <br /> <br />Construction cost <br />site work, interface piping, roads @ 5% <br /> <br />Construction cost <br /> <br />12 <br /> <br />. J ~ .r <br /> <br />180,000 <br />9,000 <br /> <br />, <br />" <br />j <br />J <br />.~ <br />"1 <br />";1 <br />! <br />."~ <br /> <br />$ <br /> <br />189,000 <br /> <br />, <br />f. <br /> <br />1 <br />. <br /> <br />.; <br />":~ <br /> <br />, <br />"j <br />q <br />it <br />.'~ <br /> <br />" , <br />. . 4.,"". ;'.,-"~",,.:~ _;~ <br /> <br />.,~"';..~;,_L <br />